Similar Projects
Terminal A Renovation Phase III, Front Door Modernization
Post-Bid
Less than $4,200,000 est. value
San Antonio, TX 78216

Overhead Door Maintenance San Antonio District
Term Contract
Post-Bid
San Antonio, TX 78229

ATC Tower Glass Replacement
Results
San Antonio, TX 78234

Replace SCIF Doors
Results
$25,000 to $100,000 est. value
San Antonio, TX 78253

Krier Center Door Replacement/Canopy Project
Post-Bid
San Antonio, TX 78223

Locksmith Services for Region 08 Offices
Term Contract
Results
Austin, TX

John Peace Library (JPL) Replace Exterior with Windows
Post-Bid
$2,000,000 est. value
San Antonio, TX 78275

2020 Door Hardware Project
Results
Less than $780,000 est. value
San Antonio, TX 78249

San Antonio Babcock AO - Refresh Interior, Doors
Post-Bid
San Antonio, TX 78201

Annual Contract for Overhead Door Repairs for the San Antonio Fire Department
Term Contract
Results
San Antonio, TX 78283

Construction of Door of Equality Art Structure
Results
San Antonio, TX 78204

Job Order Contract (JOC) for as Needed Commercial Glass Repairs and Renovations
Results
$75,000 est. value
San Antonio, TX 78200

Purchase and Installation of Overhead Door Operators at Saws Steven M Clouse Recycle Center Fleet Building
Results
San Antonio, TX 78212

Human Resources Security Upgrades
Results
Less than $49,646 est. value
San Antonio, TX 78204

Annual Contract for Building Glass Maintenance and Replacement
Term Contract
Results
San Antonio, TX 78283

Reported 04/09/2021 12:00 AM
Project Title

Fire Door Repairs

Physical Address View project details and contacts
City, State (County) San Antonio, TX   (Bexar County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Owner
Owner View project details and contacts
Architect View project details and contacts
Description

The Owner is seeking qualified contractors to provide proposals to repair fails found in the fire doors across three (3) locations. A fire door inspection was performed in January (2021) and found 1474 fails across 672 fire doors. The project must be completed within 120 days from notice of award. Due to the urgency and importance of this request, University Health requires respondents to have a minimum of 3 years of experience, 5 years preferred, performing these services for a healthcare facility. University Health reserves the right to award to multiple vendors. The locations include: University Health (Rio, Sky and Horizon Towers) 4502 Medical Drive, San Antonio, TX 78229; Texas Diabetes Institute 701 South Zarzamora Street, San Antonio, TX 78207; RBG Clinical Services & Milagros Pharmacy 903 West Martin Street, San Antonio TX, 78207.

Details

Division 08 - Openings, Doors and Frames, Windows.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents