Similar Projects
STPA Wing Construction
New Construction
Conception
Edinburg, TX

14 Elementary Gym Renovations
Renovation
Design
Edinburg, TX

La Joya ISD Esser Funds - Canopy Structures Phase 3
Infrastructure
Design
$98,000 CJ est. value
La Joya, TX 78560

Bridge Replacement
Demolition, New Construction, Infrastructure
Bidding
$1,390,253 CJ est. value
Linn, TX 78541

FM 493 and Country Road-Phase I Subdivision Drainage Improvements
Infrastructure
Bidding
$500,000 CJ est. value
McAllen, TX 78504

Concrete and Related Items
Term Contract
Sub-Bidding
Edinburg, TX 78539

Traffic Signal Improvements
Infrastructure
Sub-Bidding
$1,249,261 CJ est. value
Alamo, TX 78516

San Carlos Elementary Gym Addition
Addition
Post-Bid
Edinburg, TX 78539

Aqualina at Tres Lagos Phase 1 Subdivision - Utility and Paving Improvements
Post-Bid
McAllen, TX 78504

Psja Isd Baldemar G Cano Central Kitchen Complex Canopy Additions
Addition
Results
$241,600 est. value
Pharr, TX 78577

Beethoven Secondary and Rembrandt Early Childhood Building Construction
New Construction
Results
Pharr, TX

Brewster Elementary/Middle School - New Fine Arts Building
Construction
Less than $1,560,000 est. value
Edinburg, TX 78541

Quick Quack Car Wash / Donna
New Construction, Infrastructure - 4,189 SF
Construction
$500,000 CJ est. value
Donna, TX 78537

Dutch Bros Coffee / Mission
New Construction, Infrastructure - 950 SF
Pending Verification
$350,000 CJ est. value
Mission, TX 78572

Only Love Prescribed Pediatric Extended Care Center
New Construction, Infrastructure - 7,582 SF
Pending Verification
$1,000,000 CJ est. value
McAllen, TX 78504

Last Updated 07/29/2022 01:11 PM
Project Title

Brillante Academy Phase 1 New School - New Campus

Physical Address View project details and contacts
City, State (County) Mission, TX 78572   (Hidalgo County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $25,000,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this project includes, but is not limited to, the following: site work and new construction of a one story above grade, 23,000 square foot educational facility and a 7,000 square foot, one story above grade educational facility. As of July 26, 2022, a general contractor has not been selected for this project. A firm construction timeline for this project has not yet been released.

Details

,, 39,000 SF - 1 Story Above Grade, 7,000 SF. 1 Story Above Grade, 32,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents