Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

11Th Street Apartments
New Construction
Design
Mebane, NC

RFP Design - Western Union County Center for Entrepreneurship
New Construction, Infrastructure
Design
$6,200,000 CJ est. value
Polkton, NC 28135

Construction Improvements to the Alleghany High School Football Field and Running Track
Infrastructure
Bidding
$800,000 CJ est. value
Sparta, NC 28675

Brunswick County Utilities Operations Center Building Expansion
Addition, Demolition, Renovation, Infrastructure
Bidding
$2,500,000 CJ est. value
Holden Beach, NC 28462

Installation of Polyurea Pavement Marking Lines
Infrastructure
Sub-Bidding
$70,000 CJ est. value
Sparta, NC 28675

Installation of Polyurea Pavement Marking Lines
Infrastructure
Sub-Bidding
$70,000 CJ est. value
Sparta, NC 28675

Parking Lot Landscaping
Post-Bid
Asheville, NC 28806

Hurricane Matthew Hazard Mitigation Grant Program Elevation of 1 Residential Structure
Post-Bid
Windsor, NC 27983

Water Main Replacement
Results
Wadesboro, NC 28170

Testing Residential and Commercial Backflow Prevention Assemblies
Results
Bolivia, NC

Sewage Lift Station Rehabilitation & Upgrades - Brunswick County
Infrastructure
Conception
$2,800,000 est. value
Bolivia, NC

New Anson Middle School
New Construction, Infrastructure - 160,000 SF
Design
$52,688,803 CJ est. value
Wadesboro, NC 28170

Shallotte Rest Area Renovation - Readvertisement
Infrastructure
Bidding
$3,000,000 CJ est. value
Bolivia, NC 28422

Last Updated 08/10/2022 07:32 PM
Project Title

Installation of Regenerative Stormwater Conveyance

Physical Address View project details and contacts
City, State (County) Lenoir, NC 28645   (Caldwell County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $127,201 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 10, 2022, project was awarded to RES Environmental Operating Company, LLC, awarded amount is $127,200.72. The gully is to be restored with natural channel design of approximately 150 linear ft. and the exposed 4 in. PVC sewer line is to be buried under an armored berm. The contractor will be responsible for all excavation and aggregate hauling associated with the project. Two silt fences, a sedimentation basin, and a construction entrance will be installed, and repaired as necessary, by the contractor before excavation begins. Soil fill will be placed in 8 to 12 in. lifts and compacted to a minimum of 85% STP. Every other lift will be tested by a licensed geotechnical engineer and shall identify berm materials, reference maximum density, and optimum moisture content at the time of compaction. Grade control structures (cascades, steps, and riffles) will be lined with 0.25 ft. gravel bedding (#57 stone) atop a non-woven geotextile. Efforts will be taken by the contractor to properly anchor the geotextile into trenches. Boulders will be double layered and placed according to detail. Footer and tie out boulders will be properly buried into the soil. At final grade, the contractor will place and till excess organic cut as topsoil in a minimum of 1 in. thickness. Erosion control matting will be pinned and staked in place with wooden pegs on berms and pool banks and live stakes in pool banks only. Effort shall be made for the existing native trees and vegetation that do not conflict with grading be kept and protected. The boulder and cobble grade control structures will sit atop not only a 0.25 ft. layer of #57 stone but also a 4 ft. wide by 3.5 ft. deep filter media (ASTM C33 Sand) channel. The depth of filter media in the channel will vary from 1 ft. below berms to 2.5 ft. below pools. Soil lined with a non-woven geotextile will be placed above the 1 ft. deep sand to form berms. An additional 1.5 ft. of sand will be placed in the pools between berms. A 0.25 ft. gravel layer will be placed on top of the sand in the pools and on the geotextile lined soil berms. Cobbles will be placed on top of the gravel on the upstream facing berm surface, otherwise known as the glide. Boulders will be placed on top of the gravel on the steeper downstream facing berm surfaces, known as cascades, and cobbles will be placed on top of the flatter downstream facing berm surfaces, known as riffles. Questions concerning the RFP requirements must be submitted in writing via email to kgshelto@ncsu.edu, Subject Line: RFP #63-KGS862737 - Questions, no later than 5:00 P.M. on Wednesday, July 6, 2022. Questions will be answered in the form of an addendum to this RFP In case of default by the Contractor, the University may procure the services from other sources and hold the Contractor responsible for any excess cost occasioned thereby. The University reserves the right to require performance bond or other acceptable alternative guarantees from successful offeror without expense to the University. Offerors are cautioned that this is a request for offers, not a request to contract and the University/State reserves the unqualified right to reject any and all offers when such rejection is deemed to be in the best interest of the University or State.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents