Similar Projects
Cornerstone Village Apartments
New Construction
Conception
Oakdale, MN 55128

New Ulm Spring Roadside Parking Area
Bidding
MN

Mccarron Parking Lot Paving
Infrastructure
Bidding
Saint Paul, MN 55113

New Heights Elementary School, South Point Elementary School, Central Middle School - 2021 Improvements
Post-Bid
East Grand Forks, MN 56721

Grandview South Area Street and Utility Improvements Improvement
Post-Bid
$9,000,000 to $10,000,000 est. value
Brooklyn Center, MN

CSAH 34 Reconstruction
Results
Fergus Falls, MN 56537

ADA Improvements, Signal System, Lighting, Drainage
Results
MN

Vita Attiva Development Expansion
New Construction, Infrastructure
Construction
Farmington, MN

Fairhill Estate at North Creek Addition
New Construction, Infrastructure
Pending Verification
Farmington, MN

Discovery Walk Project
Infrastructure
Bidding
$17,000,000 to $21,000,000 est. value
Rochester, MN 55906

West Bridge Street Reconstruction
Post-Bid
$3,400,000 est. value
Owatonna, MN

South Lake Minnetonka Public Safety Facility Improvements
Results
Shorewood, MN

In Redwood County on TH 19 (W Bridge St) From 200 Ft East of N Grove St to 120 Ft West of S Minnesota St Approach Panels, ADA Improvements, Pipe Lining, and Bridge No. 5133
New Construction, Infrastructure
Bidding
MN

2021 Street Improvements Project
Post-Bid
Maple Lake, MN

METRO D Line BRT
Results
MN

Last Updated 08/12/2021 12:12 PM
Project Title

Heartland State Trail - Steamboat Loop

Physical Address View project details and contacts
City, State (County) Walker, MN   (Cass County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $970,226
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A. The work will be done under one prime contract that includes: General Construction B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Construction of new paved bike trail, rerouting the Steamboat Loop trail section up through Tower Hill. Total length of trail is 1.48 miles. Major Work Items Include: Clear and Grub – 5.5 Acres; Excavation- 55,190 CY; Preassembled Silt Fence – 7,290 LF; Granular Borrow 500 CY; Grade and Compact Subgrade 12,122 SY; Aggregate Base Class 5 -12,122 SY (6 in thick); Bituminous Surface – 8,655 SY (2.5 in thick); Corrugated Aluminum Steel Pipes – 660 LF; Precast concrete MH structures, castings and grates – 6; Turf Establishment - 8.2 Acres; Erosion Control Blanket – 7,086 S.Y. 3% (TG/ED/VO) subcontracting goal established.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents