Similar Projects
Wastewater Treatment Facility
New Construction, Infrastructure
Bidding
$2,014,685 est. value
Strasburg, ND

Lift Station Rehab - Reconstruction
New Construction
Bidding
$6,998,420 est. value
Fargo, ND

West End Lift Station Improvements
New Construction
Post-Bid
$150,000 to $250,000 est. value
Valley City, ND

Master Lift Station Improvements
New Construction
Post-Bid
$150,000 to $250,000 est. value
Valley City, ND

South Regional Water Connection Phase 2
Results
$2,000,000 est. value
Fargo, ND

GSR and Pump Station Replacement
Results
$1,200,000 est. value
Cavalier, ND

UND Aerospace Apron Reconstruction Phase 2
Renovation, Alteration
Post-Bid
Grand Forks, ND 58202

Fargo Red River Pump Station Improvements
Renovation
Results
$5,500,000 est. value
Fargo, ND

Sanitary Sewer Improvement
New Construction, Alteration
Post-Bid
$1,100,000 est. value
Horace, ND

Leachate Forcemain and Lift Station
Results
$801,000 est. value
Dickinson, ND

Upgrade Lift Station 12 and Lift Station 13
Renovation
Results
$775,000 est. value
Grand Forks, ND

Lift Station Improvements
Renovation
Results
$800,000 est. value
Jamestown, ND

Sewer Improvement District No. 2019-1
Results
$5,000,000 to $5,400,000 est. value
Kindred, ND

Velva Goldade Lift Station Replacement
Renovation
Results
$400,000 to $500,000 est. value
Velva, ND

Storm Sewer Lift Station Rehabilitation/Reconstruction and Incidentals Improvement
New Construction
Results
$904,538 est. value
Fargo, ND

Reported 04/29/2022 12:00 AM
Project Title

3rd Street Lift Station Improvements

Physical Address View project details and contacts
City, State (County) Grafton, ND 58237   (Walsh County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes the following Work: Mobilization, bonding and insurance; traffic control; removal of existing lift station and manholes; installation and startup of new lift station; 4-inch forcemain; 10-inch gravity sewer and manholes; connection to existing gravity sewer system; bypass pumping; removal and replacement of pavement; miscellaneous site work; surface restoration and other miscellaneous items.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents