Similar Projects
Airport Perimeter Road Repair
Infrastructure
Bidding
$400,000 est. value
Smyrna, TN 37167

Discovery School Walking Track
Post-Bid
Murfreesboro, TN 37130

Charter Place Realignment at South Waldron Road
Post-Bid
La Vergne, TN 37086

Mercury Boulevard Sidewalks, Crosswalks, and Pavement Markings
New Construction
Results
Murfreesboro, TN 37129

Taxiway Echo & Apron Expansion
New Construction
Results
$1,389,299 est. value
Murfreesboro, TN 37129

Asphalt Paving and Materials
Term Contract
Post-Bid
La Vergne, TN

Rucker Lane Phase 1
Results
$2,299,947 est. value
Murfreesboro, TN 37128

Seal Coat & Striping
Infrastructure
Post-Bid
Murfreesboro, TN 37127

Road Resurfacing on S.R. 96
Results
TN

Cheatham Stoplog Concrete Storage Slab
Term Contract, Infrastructure, Alteration
Post-Bid
$1,000,000 to $5,000,000 est. value

Lee Victory Recreational Park Entrance Road
Results
Smyrna, TN

Street Striping Bid 2022-2025
Term Contract
Post-Bid
La Vergne, TN

Crawler Sewer Camera Inspection System
Term Contract
Results
Murfreesboro, TN 37130

Upper Chaney Woods - Interceptor Sewer
Infrastructure
Post-Bid
La Vergne, TN

Resurfacing on S.R. 99 from U.S. 31A (S.R. 11) (L.M. 7.29) to the Rutherford County Line (L.M. 11.44)
Results

Reported 06/24/2022 12:00 AM
Project Title

Genie Lane Extension Project

Physical Address View project details and contacts
City, State (County) Smyrna, TN 37167   (Rutherford County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $1,145,200 [brand] Estimate
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project will provide a link between the current termination point of Genie Lane at Wolverine Trail to Potomac Place. This project will include construction of a new road and storm drainage for approximately 0.39 miles in length. The project will also include gas, water, sewer, and electric utilities.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents