Similar Projects
Warm Beach Water System Water Replacement
Infrastructure
Post-Bid
$2,000,000 est. value
Stanwood, WA 98292

2022 Utility Replacement Project
Infrastructure
Post-Bid
$300,000 est. value
Edmonds, WA

2021 Capital Improvement - 32nd Street SE Highway 9 Crossing Water Main Project
Infrastructure
Results
$250,000 est. value
Lake Stevens, WA 98258

164th Street SW Transmission Main Connection
Infrastructure
Results
$10,000,000 to $12,000,000 est. value
WA

SWR - 92nd Avenue NE Forced Relocation
Infrastructure
Post-Bid
$107,200 est. value
Everett, WA 98208

Station 50 - Waterline Extension
Infrastructure
Results
Arlington, WA 98223

Tulalip Water Pipeline Mortar Repair
Infrastructure
Results
$1,000,000 est. value
Everett, WA 98201

Transmission Mains 1 and 2 Air Valve Replacement
Infrastructure
Results
$1,150,000 to $1,250,000 est. value
Lynnwood, WA

2022 Water Hydrant
Term Contract
Results
Lynnwood, WA 98087

2022 Water and Sewer System Improvements
Infrastructure
Results
$1,818,040 est. value
Mukilteo, WA

Westside Water Main Improvements
Infrastructure
Results
$5,500,000 to $5,750,000 est. value
Mountlake Terrace, WA

SWR - North Soundview Drive Water Main Relocation Project
Infrastructure
Results
$165,000 est. value
Edmonds, WA 98026

Water Main Replacement 'W'
Infrastructure
Results
$1,942,237 est. value
Everett, WA

2022 Water Main and PRV Improvements
Infrastructure
Results
$810,000 est. value
Snohomish, WA 98290

Madison Combined Sewer Separation
Infrastructure
Results
$3,200,000 est. value
Monroe, WA

Last Updated 06/22/2022 11:29 AM
Project Title

County Forces Projects - Rivershore Road Flood Repair

Physical Address View project details and contacts
City, State (County) Clearview, WA 98290   (Snohomish County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Construction Documents, Construction Start Expected September 2022
Bids Due View project details and contacts
Estimated Value $207,595
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a water / sewer project in Snohomish, Washington. Working plans call for site work for a water / sewer project. The Snohomish County Road Engineer approved the following COUNTY FORCES PROJECTS for the 2022 program year. All construction estimates include the cost of labor, materials & equipment. Details are on file with the Snohomish County Department of Public Works. CRP# RC1765 - Rivershore Rd Flood Repair near 6725 Snohomish County Public Works proposes to repair a 100' embankment section of Rivershore Rd that sustained damage. The project will consist of removal of unsuitable and failing embankment/dike material, construction of a geogrid reinforced slope, and backfilling and reconstructing the roadway. The Method of Contractor Selection has not been determined at this Time. The total estimated construction cost of RC1765 is $207,595

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents