Similar Projects
Hidden Meadows
New Construction
Design
Cumberland, RI

Parking Lot Expansion
New Construction
Design
Westerly, RI 02891

A Foundation to Support A New Pavilion Structure
Post-Bid
Scituate, RI 02857

Gravel Roadway Reconstruction Of Long House Trail And Royal Burial Ground Trail
Alteration
Post-Bid
Charlestown, RI 02813

Demolition of Structures and Site Work at Two Properties
Demolition
Results
Foster, RI 02825

Storm Drain Cleaning, Rooting and Repair
Results
Kingston, RI

Site Improvements at Shawomet Terrace
Infrastructure
Post-Bid
Warwick, RI 02889

Site Improvements at Kickemuit Village Housing Development
Results
Warren, RI 02885

Southside Site Work and Grading
Infrastructure
Post-Bid
Warwick, RI

West Marlborough Street Storm Drain Improvements
Results
Newport, RI 02840

Site Improvements at Goldsmith Manor
Infrastructure
Post-Bid
East Providence, RI 02914

Esmond Park Stormwater Quality Improvements
Results
Smithfield, RI 02917

Roger Williams Park Mounted Command Site Improvements
Infrastructure
Post-Bid
Providence, RI 02907

Warwick Ponds Buckeye Brook Stormwater Improvements
Infrastructure
Results
Warwick, RI

Storm-Water Drainage Inspection
Infrastructure
Results
Westerly, RI

Reported 03/18/2022 12:00 AM
Project Title

CSO Phase III A-9 GSI Projects

Physical Address View project details and contacts
City, State (County) Central Falls, RI 02863   (Providence County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of construction of green stormwater infrastructure (GSI) projects, soil remediation/capping and ballfield/court improvements (Pierce Park) at the designated sites on River Street, Samoset Avenue and High Street in Central Falls, RI. Work includes demolition and preparation of the site, grading, contaminated soil removal, construction of the following GSI systems: underground infiltration system, underground infiltration system/sand filter, tree trench (BMPs), associated drainage network improvements, porous pavement basketball court, little league baseball field improvements, permeable pavers, fencing, sidewalks, curbing, paving, landscaping, and all associated work as shown on the Construction Drawings.

Details

Division 01 - General Requirements, Temporary Barriers and Enclosures, Temporary Fencing.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents