Similar Projects
Rehabilitation Work on Their Property - 229 Camp Street
Post-Bid
Plainville, CT

Lead Mitigation, Windows, Carpentry and Doors
Results
Vernon, CT

Mechanical Orchestra Pit Lift
Post-Bid
Stamford, CT

Windows and Carpentry
Post-Bid
Vernon, CT

On Call Carpentry and General Repair Services
Term Contract
Post-Bid
East Hartford, CT

Townwide Painting and Carpentry Services
Term Contract
Results
Less than $20,000 est. value
West Hartford, CT

Happy Acres House for Painting and Carpentry of the Residence
Post-Bid
Sherman, CT 06784

Old Town Mill Water Wheel Repair
Results
$5,000 to $50,000 est. value
New London, CT

470 Candlewood Lake Road North - General Carpentry
Results
New Milford, CT 06776

Roofing and Carpentry
Results
Less than $13,825 est. value
Plainfield, CT

On Call and Emergency General Trades Contracting Services
Term Contract
Post-Bid
New Haven, CT 06515

Reported 08/01/2019 12:00 AM
Project Title

Carpentry and Labor Services at Hockanum Park Maintenance Building

Physical Address View project details and contacts
City, State (County) East Hartford, CT   (Hartford County)
Category(s) Single Trades
Sub-Category(s) Carpentry
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Scope of Work: 1. Create opening at rear of building for new 8,x 10, overhead door. (Door installed by door company). 2. Remove windows and exterior door at lunch room and install new. 3. Fill in 5,x5,x5, abandoned pit inside building and top off with concrete slab. 4. Remove old vent fans in shop. 5. Remove and block in old vents on exterior walls, see plans. 6. Clean windows panes. 7. Clean janitors sink in shop to a like new condition. 8. Erect new heavy duty metal shelving 24" deep in proposed shades room. 9. Relocate old shelves to new storage room. 10. Build ramp out of Pressure Treated wood and install metal railings into lower storage room. 11. Build new work shop bench out of lumber. 12. Install new 2" thick insulated ceiling by Armstrong tile in the community building and spray paint grid enamel white. 13. Routine cleaning and clearing out of garbage, and junk inside bldg. as project progresses. 14. Interior Painting ceilings and walls in the Maintenance shop and smaller rooms. Community room not included in painting. See attached sheets for painting.
Details
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 08 - Openings, Doors and Frames, Windows.
Division 12 - Furnishings, Institutional Furniture, Library Furniture, Book Shelves, Pews and Benches.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents