Similar Projects
Watkins HVAC Improvements
Alteration
Bidding
Chattanooga, TN

John A Patten Recreation Center HVAC Installation
Alteration
Bidding
Chattanooga, TN 37419

EHS Ground and Second Floor Central Sterile Services
Post-Bid
Chattanooga, TN 37421

HVAC Repair and Replacement Service
Post-Bid
Chattanooga, TN

HVAC Replacement for Dogwood Manor
Results
Chattanooga, TN 37402

Mary Walker Towers Renovations of Stairwells & HVAC Systems
Results
Chattanooga, TN

Select Unit Price Contracts
Post-Bid
Chattanooga, TN 37400

HVAC Replacement at Center for Creative Arts - Phase 2
Results
Chattanooga, TN 37405

HVAC Replacement, Lighting, and Associated Renovations
Post-Bid
Chattanooga, TN 37406

Gateway Tower Renovation HVAC Systems Replacement
Results
Chattanooga, TN 37402

Testing and Balancing for HVAC Systems
Term Contract
Post-Bid
Chattanooga, TN

Two HVAC Units Replacement at Chattanooga TN Air Traffic Control Tower
Results
Chattanooga, TN 37421

CHA Central Office HVAC Replacement Project
Post-Bid
Chattanooga, TN 37404

Roof and HVAC Replacement
Alteration
Results
Chattanooga, TN

EHS Main Campus Replace AHU for Ancillary West 5th Floor LDR Penthouse
Post-Bid
Chattanooga, TN 37403

Reported 12/15/2021 11:21 AM
Project Title

HVAC Upgrades/Phase 3 at Center for Creative Arts

Physical Address View project details and contacts
City, State (County) Chattanooga, TN 37405   (Hamilton County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of HVAC Upgrades for Chattanooga High School Center for Creative Arts – Phase 3. A partial replacement of the HVAC system in the existing buildings. The new system will be an extension of the system installed in Phases 1 & 2, which will include ductwork, piping and equipment in the C building and the A Building, including the gym, auditorium, and adjacent spaces. The new hydronic system will tie into the existing pipes in corridors at specific locations as shown on the mechanical plans. The schedule for this project will begin at the execution of the contract and end with the beginning of the school term in fall 2022. The contractor will be responsible for coordinating shutdowns to accommodate the installation. The hydronic system must remain operational while school is in session, therefore much of the project will be required to be executed during the summer of 2022, including all ceiling work and above ceiling piping work. Note though that the contractor will be given 2 classrooms at a time for 2 days on a rotating basis to change out unit ventilators during the school year prior to summer break. Contractor will be required to coordinate with HCDE concerning classroom scheduling.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents