Similar Projects
NTP Vertical Turbine Pump Rebuild
Bidding
Brighton, CO 80603

Colorado City Artesian Well 4584-F
Bidding
Colorado City, CO

Water Right Due Diligence - Arkansas River Basin
Post-Bid
Denver, CO

Carmichael Park Vault
Post-Bid
Brighton, CO 80601

2019 Alluvial Well Improvements
Results
Less than $2,000,000 est. value
Commerce City, CO

Repair by Replacing Domestic Water Pumps B420
Results
$1,000,000 to $5,000,000 est. value
Colorado Springs, CO

Non-Potable Pond Pump Station
Construction
Brighton, CO 80601

MMAARS 6 Well Project
Bidding
Denver, CO

South Suburban Littleton Golf Course Well # 1
Post-Bid
Littleton, CO

Six Denver Basin Aquifer Wells Drilling Project
Results
Denver, CO

Directional Boring and Trenching
Bidding
Fort Collins, CO

On Call Alluvial Well Maintenance & Repair
Post-Bid
Castle Rock, CO

EC, Provide Sump Pump and Controls
Results
Loveland, CO 80537

2020 On Call Deep Well Repair
Post-Bid
Castle Rock, CO 80109

2020 Well Maintenance Project
Results
Less than $279,000 est. value
Aurora, CO 80016

Last Updated 02/24/2021 10:54 AM
Project Title

North Campus Well Field Expansion, Former Thornton Property - Groundwater Production Well Drilling Project

Physical Address View project details and contacts
City, State (County) Aurora, CO 80012   (Adams County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $584,000 to $700,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed under the City of Aurora’s North Campus Well Field Expansion, Former Thornton Property – Groundwater Production Well Drilling Project consists of furnishing all materials, equipment, tools, labor, supplies, and everything else necessary to drill, construct, develop, and performance (pump) test up to six (6) 30-inch diameter shallow alluvial groundwater production wells at the City of Aurora’s North Campus Well Field (Well Field). The Well Field is located on the west bank of the South Platte River approximately midway between Brighton and Fort Lupton, Colorado (refer to accompanying project location map). The City of Aurora anticipates these wells will be constructed using a reverse circulation drilling system. The work includes, but is not limited to the following: 1. Drilling of borehole and installation of surface conductor casing. 2. Drilling of production well bore through alluvial gravels and into claystone bedrock. 3. Installation of stainless-steel casing and screen based on site conditions and field design from on-site hydrogeologist. 4. Gravel pack installation based on site conditions and field design. 5. Cement and seal the upper bore. 6. Perform well development and testing, including an 8-hour step test and a 72-hour pump test. 7. Preparation of submittals. 8. Attendance at weekly construction progress meetings. 9. Acquisition of all required permits from Colorado Division of Water Resources, Colorado Department of Public Health and Environment, and Weld County Colorado, and submittal of all required documentation per the permit requirements.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents