Similar Projects
I-90, SR 161, SR 202 and SR 203 - Fish Passage
Infrastructure
Bidding
$165,000,000 to $180,000,000 est. value
WA

42nd Avenue South Sewer Capacity Improvement
Infrastructure
Bidding
$223,750 est. value
Seattle, WA 98168

Rainier Beach High School Bid Packages - 09 Soldier Pile Wall
Infrastructure
Sub-Bidding
$150,000 est. value
Seattle, WA 98118

Engineering Services for McSorley Creek Shoreline & Estuary Restoration Project
Renovation, Alteration
Post-Bid
$950,000 est. value
Des Moines, WA 98198

Geosynthetic and Erosion Control
Infrastructure
Post-Bid
WA

2021 Horse Creek Streambed Repairs Project
Infrastructure
Results
$90,000 to $100,000 est. value
Bothell, WA 98011

Deception Creek Line Extension
Infrastructure
Results
$2,235,825 est. value
WA

Design/Built - SR 108/US 101/Mason and Thurston Co Fish Barriers - Remove Fish Barriers
Infrastructure
Bidding
$50,000,000 est. value
Seattle, WA

Lummi Nation Seapond Dike Repair and Armoring
Infrastructure
Post-Bid
Bellingham, WA

Storm Renewal and Replacement Project
Infrastructure
Results
$620,000 to $650,000 est. value
Auburn, WA 98092

Fall City Floodplain Restoration Planting
Alteration
Post-Bid
$1,000,000 est. value
WA

2442 WLSP Sinkhole Lake Restoration
Infrastructure
Results
$276,650 est. value
Bellevue, WA 98008

Tukwila Macadam Road South Water Main Upgrade and Sidewalk Improvements
Infrastructure
Post-Bid
Tukwila, WA 98178

Eastrail North Segment Tie Removal and Interim Trail Phase 2
Infrastructure
Results
$1,280,212 est. value
Kirkland, Woodinville, WA

Melrose I-5 Drain Crossing Rehabilitation
Alteration
Post-Bid
Seattle, WA

Last Updated 05/26/2022 01:41 AM
Project Title

Soderman Creek Restoration

Physical Address View project details and contacts
City, State (County) Preston, WA   (King County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $79,234
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a civil project in Preston, Washington. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; water / sewer project; and water / sewer project. Grubbing & Clearing, Culverts, Waterways, Stormwater Channels, Construction, Demolition/Building Removal/Hauling/Salvage, Small Works, Dams/Reservoirs, Fish Passage, Grade and Surface, Excavation, Landscaping - Seeding. Description: The project consists of the removal of: a concrete weir, 55 feet of ACM waterline, an 80,000 gallon concrete cistern, and 1713 feet of road abandonment, including two fish barrier culvert removals. The estimated cost of the project is $75,234, and the required substantial completion date is September 15, 2022. The project is located south of (and accessed through) the Blue Sky RV Park, located at 9002 302nd Ave. SE, Preston, WA 98027.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents