Similar Projects
RFP - Engineering and Surveying Services
Term Contract
Conception
Cheyenne, WY 82001

RFQ - Emergency Operations Center (EOC) Site Upgrades
Infrastructure
Conception
$350,000 CJ est. value
Jackson, WY 83001

Overhead Door Replacements
Renovation
Design
$40,000 CJ est. value
Guernsey, WY 82214

Installation Services - Cheyenne
Renovation
Design
$302,343 CJ est. value
Cheyenne, WY 82001

Scalehouse Replacements
New Construction, Infrastructure
Bidding
$320,000 CJ est. value
Lander, WY 82520

Boysen Peak Generator Site and Cody Office Remodel
Build-out
Bidding
$500,000 CJ est. value
Cody, WY 82414

Solid Waste Thermal Lenses and CRL Electrical Service Improvements
Renovation
Sub-Bidding
$250,000 CJ est. value
Evansville, WY 82636

Washakie Ranger District Office Fence Expansion
Infrastructure
Sub-Bidding
$100,000 CJ est. value
Lander, WY 82520

Teton County Recycling Center Electrical Service Upgrade
Renovation, Alteration
Post-Bid
Jackson, WY 83001

Multiple-Award Indefinite Delivery/Indefinite Quantity (IDIQ) Contract(s) for General Construction with Design/Build Capabilities
New Construction
Post-Bid
Less than $500,000,000 est. value

Thyra Thomson State Office Building Cubicles
Renovation
Results
Casper, WY 82601

2022 Construction Contract
Renovation, Term Contract
Results
Jackson, WY

RFQ - Construction Materials Testing and Inspection Services for the Casper State Office Building
Term Contract
Conception
Casper, WY 82601

Department of Workforce Services Conference Center AudioWideo Solution
Renovation
Design
$50,000 CJ est. value
Gillette, WY 82718

Concrete and Handrail Replacement
Infrastructure
Bidding
$200,000 CJ est. value
Kemmerer, WY 83101

Last Updated 08/04/2022 11:35 AM
Project Title

Wyoming State Fair Master Plan

Physical Address View project details and contacts
City, State (County) Cheyenne, WY 82001   (Laramie County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids
Project Status Obtained from a credible source, Awaiting verification, Construction start expected October 2019
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Questions: Must be submitted through the online bidding system no later than 2:00 P.M. Mountain Time on, APRIL 18, 2019. Questions submitted after this deadline will not be accepted or considered. Note: All responses must be uploaded completely through the online bidding system no later than the 2:00 p.m. due date indicated in the document. If your submission has not completely uploaded by the 2:00 p.m. deadline, the Public Purchase system will lock and your response will be incomplete and deemed non-responsive and eliminated from the evaluation process. The State of Wyoming Department of Agriculture commissioned a comprehensive Master Plan Study in 2002 to identify and prioritize needed facilities improvements that were developed and implemented in the years 2004 through 2010. The 2002 Master Plan is now over 17 years old and in need of updating. Along with the need to develop new facilities and make improvements to existing ones, it time to explore new markets and attractions to keep the Wyoming State Fair and its facilities viable and prosperous for the foreseeable future. With increasing competition for fair and non-fair event dollars, a study is necessary to c o n s i d e r strengths and weaknesses while providing recommendations for improvement that will keep the Wyoming State Fair relevant and competitive. Proposals should be accompanied by the attached Proposal Price Sheet and signed by the proper official of the firm. All proposals should be uploaded on the public purchase online bidding system. Proposals sent by FAX, email, or paper copy may be rejected. Proposals should be submitted through the public purchase online bidding system on or before the time and date specified. Proposals received after the time and date specified may be rejected. The State of Wyoming reserves the right to withdraw this Request for Proposal, without cause, at any time before a contract has been fully signed and submitted to the A&I Procurement Office. As of April 5, 2019, The method of contractor selection has not been determined at this time. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents