Similar Projects
Construction of Treatment Plant Road Culvert
Infrastructure
Bidding
$2,000,000 est. value
Indian Lake, NY 12812

Dickersonville Road Culvert Replacement Project
Infrastructure
Bidding
$3,000,000 est. value
Ransomville, NY 14131

City of Kingston Pedestrian Safety Action Plan
Term Contract
Post-Bid
NY

Ford Road Large Culvert Replacement
Post-Bid
Pittstown, NY

Mirror Lake Drive Sidewalk, Drainage & Pavement Improvements
Results
Less than $1,600,000 est. value
Lake Placid, NY 12946

Rehabilitation of Culvert LIN 252 (Spier Falls Road) Over Tributary to the Hudson River
Results
Moreau, NY 12828

County Route 11 Box Culvert
Post-Bid
Albany, NY

Curtis Road Embankment Stabilization
Results
Less than $150,000 est. value
Honeoye, NY

Watson Hollow Precast Concrete Culvert
Term Contract
Post-Bid
NY

Sauquoit Creek Channel and Floodplain Restoration Program, Project II
Results
$3,000,000 to $3,500,000 est. value
Whitesboro, NY 13492

Replacement of Gaylord Road Over Apalachin Creek Tributary
Infrastructure
Post-Bid
$850,000 est. value
Owego, NY

Fort De La Presentation Trail and Shoreline Stabilization
Results
Ogdensburg, NY

Shoreline Stabilization Project
Infrastructure
Post-Bid
NY

Gulf Brook Restoration - Phase III
Results
Keene, NY

Frear Park, Phase 1 Golf Course Improvements
Infrastructure
Post-Bid
Troy, NY 12180

Last Updated 07/29/2022 12:32 AM
Project Title

Fy22 Buffalo North Breakwater Repair

Physical Address View project details and contacts
City, State (County) Buffalo, NY 14203   (Erie County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Buffalo North Breakwater Repair: Repair options include a rubble-mound overlay at a 1V:2H slope comprising of 5.3 to 11.9 ton armor stone, overlying 0.4 to 1.2 ton underlayer and 2 to 119 lb bedding for the southern reach of the repair and wrapping around the South Head (Station 0+00 to 6+90), 10.7 to 23.7 ton armor stone, overlying 0.7 to 2.4 ton underlayer and 4 to 237 lb bedding for the northern reach of the repair and wrapping around the North Head (Station 14+75 to 22+00). There’s a two stone width berm at the toe of the repair at varying elevations for the northern repair with a 1V:2H slope, a three stone width berm from Station 0+00 – 6+60 and wrapping around the South face of the structure with a 1V:1.5H slope. On the channel side of the structure, the berm widens to a 30 ft width at elevation -7 with a 1V:1.5H slope. Additionally, pre-cast concrete blocks presently in place to protect the damaged works at the South Head will be retrieved and placed in the three sections where the backwall of the structure has blown out. The overlay will restore the original structure crest elevation of +13.5 feet LWD.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents