Similar Projects
Lovett Elementary School - South Parking Lot Revamp
Infrastructure
Bidding
$25,000 CJ est. value
Chicago, IL 60639

Concrete Replacement Program
Alteration
Post-Bid
Morton Grove, IL

2022 Street and Restoration Materials - Concrete
Alteration
Post-Bid
Northbrook, IL

Pin & Link Assembly Expansion Joint Retrofits 4
Alteration
Results
Chicago, IL

2022 Concrete Improvements
Infrastructure, Alteration
Results
Des Plaines, Park Ridge, IL 60068

2022 Portland Cement Concrete Material
Alteration
Post-Bid
Elgin, IL

Seascape Pool Concrete Repairs
Alteration
Results
Hoffman Estates, IL

Concrete Footings
Infrastructure
Post-Bid
$250,000 CJ est. value
Orland Park, IL 60467

2022 Exterior Concrete Restoration
Alteration
Results
Arlington Heights, IL

Concrete Work at Various Locations within the Chicago Metropolitan Area As Required
Term Contract
Post-Bid
Chicago, IL 60604

2022 Concrete Improvement Program
Alteration
Results
Schaumburg, IL

Concrete Work at Bus Turnarounds as Required
Term Contract
Post-Bid
Chicago, IL 60604

2022 Concrete Replacement Program
Alteration
Results
Bartlett, IL

Pavement Preservation
Infrastructure
Post-Bid
$351,410 CJ est. value
Oak Park, IL 60302

2022 West WRF Concrete Repairs
Alteration
Results
Elgin, IL

Last Updated 06/29/2023 05:37 AM
Project Title

2023 Retaining Wall Maintenance

Physical Address View project details and contacts
City, State (County) Palatine, IL 60067   (Cook County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes (but is not limited to) the following: mobilization, site preparation, demolition, asphalt paving, concrete paving, and retaining wall installation. B.Harper College reserves the right to reject any or all bids or parts thereof, to waive any irregularities or informalities in bidding procedures and to award the contract in a manner best serving the interest of the College. Contractors shall pay not less than the prevailing rates of wages to all laborers, workmen and mechanics performing work under this contract, and shall comply with the requirements of the Illinois Wages of Employees on Public Works Act (820 ILCS 130/1-12). Bid security in the form of bid bond in an amount equal to 10 percent (10%) of the aggregate of the Base Bid amount and all Alternate Bid amounts shall be submitted with the bid. I.A Performance, Labor, and Materials Payment Bonds in the amount of 100% of the Total Contract amount will be required from the successful bidder prior to work on site. Question Deadline 04/20/2023 at 4:00 PM CT

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents