Similar Projects
T.B. Hanna Station Phase 2 - 23-PRK-008 - City of Raymore
Infrastructure
Conception
$332,000 CJ est. value
Raymore, MO 64083

T.B. Hanna Station Phase 2 - 23-PRK-008 - City of Raymore
Infrastructure
Conception
$332,000 CJ est. value
Raymore, MO 64083

The Other Place Office Development / Belton
New Construction, Infrastructure
Design
$2,500,000 CJ est. value
Belton, MO 64012

Pavement Marking
Infrastructure
Bidding
$2,500,000 CJ est. value
Harrisonville, MO 64701

Pavement Marking
Infrastructure
Bidding
$2,500,000 CJ est. value
Harrisonville, MO 64701

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

Job Order Contract for Asphalt Pavement Repair
Infrastructure
Post-Bid
$100,000 to $250,000 est. value

2021 Bank Stabilization & Navigation Project (Bsnp) Structures Repair
Term Contract
Results

Highway D Waterline Replacement
Infrastructure
Results
Belton, MO

Chase Bank Facility and Take 5 Oil Change / Belton
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Belton, MO 64012

Chase Bank Facility and Take 5 Oil Change / Belton
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Belton, MO 64012

Good Parkway Improvements - 26-PRK-001 - City of Raymore
Infrastructure
Conception
$580,000 CJ est. value
Raymore, MO 64083

2 Bridge Replacements and Intersection Improvements
Demolition, New Construction, Infrastructure
Bidding
$10,000,000 CJ est. value
Harrisonville, MO 64701

2022 Parking Lot Improvements
Infrastructure
Post-Bid
$200,000 est. value
Belton, MO

Highway 58 Waterline Replacement
Infrastructure
Results
$313,900 CJ est. value
Raymore, MO 64083

Last Updated 05/15/2023 02:45 PM
Project Title

Hargis Gardens Drainage Improvements

Physical Address View project details and contacts
City, State (County) Belton, MO 64012   (Cass County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $2,717,793 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

**As of September 13, 2022, project was awarded toVF Anderson Builders, LLC awarded amount is $2,717,792.95 ** Drainage Improvements in Hargis Gardens. Includes the replacement culverts at Park Ave, Sunrise Dr, and Mill St, and roadway restoration with curb, inlets, and sidewalk. Also includes the construction of a detention pond, a 3 sided concrete ditch, storm sewer, sanitary sewer, and water main. Requests for information related to this RFP should be directed to: Ryan Haupt, Engineer I Telephone: (816) 892-1267 E-Mail: rhaupt@belton.org The work shall be completed by November 18, 2022

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents