Similar Projects
Sliding Glass Door for the Sterling Heights Library
Renovation
Sub-Bidding
$100,000 CJ est. value
Sterling Heights, MI 48313

New Haven Community Schools RFP Safety Security Window Film
Renovation
Sub-Bidding
$50,000 CJ est. value
New Haven, MI 48048

Harbor Springs High School First Floor Painting Project and Harbor Springs High School Locker Removal and Installation Project
Alteration
Post-Bid
Harbor Springs, MI

Doorwall Replacement Project
Alteration
Post-Bid
Redford, MI 48239

Annual Overhead Doors Inspections And Repairs
Results
Detroit, MI

CDBG Window Replacement
Alteration
Results
Taylor, MI 48180

Provision of Window Covering Services as Needed
Term Contract
Sub-Bidding
Dexter, MI 48130

Security Window Film
Alteration
Post-Bid
Caledonia, MI

2021 Mayville Windows and Door Replacement
Alteration
Results
Mayville, MI

Furnace Room Door Replacement
Renovation
Sub-Bidding
Warren, MI 48089

Woodside Elementary Window Replacement
Alteration
Post-Bid
Holland, MI 49424

Barnard, Bemis, Hill, and IAE Exterior Doors and Windows
Alteration
Results
Troy, MI

Holland Woods Middle School Steam Door
Renovation
Sub-Bidding
$350,000 CJ est. value
Port Huron, MI 48060

WCCCD Curtis L. Ivery Downtown Campus Interior/Exterior Door Replacement Project
Alteration
Post-Bid
Detroit, MI

Provision and Installation of Sliding Aluminum and Flush Wood Doors
Alteration
Results
Ann Arbor, MI 48104

Last Updated 03/29/2023 05:11 PM
Project Title

Glen Lake Window Replacement

Physical Address View project details and contacts
City, State (County) Maple City, MI 49664   (Leelanau County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $203,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

All contractors bidding on work must be bondable and must include in their bid the cost for furnishing a Co-Obligee Labor and Material Payment Bond and a Co-Obligee Performance Bond. On the proposal form the contractor will identify a cost to be deducted from their bid should bonds not be required. All questions are to be directed to the Construction Manager. No direct contact with the Owner or Architect is requested. Each Proposal shall be accompanied by a certified check, cashiers' check, money order, or bid bond made payable to The Christman Company in an amount not less than five percent (5%) of the base bid as a bid security. The Bid Security of Bidders under consideration will be returned immediately after award of contracts by the Construction Manager. The amount of the guarantee shall be forfeited to the Owner if the successful Bidder fails to enter into a contract and furnish required bonds and insurance within 30 days after award of contracts. Each Proposal shall be accompanied by a sworn and notarized statement disclosing any familial relationship that exists between the owner or any employee of the bidder and any member of the Board or the Superintendent of the school district. Bidders must certify that they are not an "Iran-linked" business. All proposals submitted shall remain valid for a period of sixty (60) days after the bid date. The Owner, Architect and Construction Manager reserve the right to waive any irregularities, reject any or all proposals, or accept any proposal, which, in their opinion, will serve their best interest.

Details

Division 08 - Openings, Doors and Frames, Windows.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents