Similar Projects
Twin Valley Road Improvements
Infrastructure
Bidding

2022 Downtown Streetscaping Improvements
Infrastructure
Bidding
Jefferson, WI

Bituminous Surfacing
Post-Bid
Watertown, WI

Curb and Gutter and Sidewalk Replacement
Post-Bid
Watertown, WI

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

C. Fort Atkinson, Robert Street, Rock River Bridge, B-28-0009
Infrastructure
Bidding
$2,000,000 to $2,999,999 est. value
WI

Seal Coating, Routing and Crack Sealing
Post-Bid
Watertown, WI

Madison - Lake Mills, Cth A, B-28-41, Airport Road,
Results
WI

Road Projects
Post-Bid
WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

Sanitary Sewer and Water Main
Results
Watertown, WI

Interurban Trail - Phase 2 - Paving
Infrastructure
Post-Bid
Jefferson, WI

Air Park Drive LRIP
Results
Watertown, WI 53094

Last Updated 03/22/2022 01:44 PM
Project Title

2022 Road Rehabilitation and Water Main Relay

Physical Address View project details and contacts
City, State (County) Fort Atkinson, WI 53538   (Jefferson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project generally involves road rehabilitation and water main relay at various locations within the City of Fort Atkinson Peterson Street (Talcott Avenue – Rockwell Avenue) Peterson Street includes, but shall not be limited to, Peterson Street includes, but shall not be limited to, approximately 800 LF of urban section street reconstruction including removals, stone base course, 580 tons of asphaltic pavement, concrete curb and gutter, concrete drive approaches, and new concrete sidewalk; approximately 780 LF of 8-inch water main installation including valves, fire hydrants, water services and miscellaneous appurtenances; sump manifold pipe installation; sanitary manhole installation; tree removal; work zone traffic control; and erosion and sediment control measures, surface restoration, cleanup and miscellaneous appurtenant facilities required to complete construction. Adrian Boulevard (Hilltop Trail – Grove Street) Adrian Boulevard includes, but shall not be limited to, approximately 6,600 SY of full depth asphaltic pavement pulverizing, shaping, grading, excavation below subgrade (EBS), 1,500 tons of asphaltic pavement, spot removal and replacement of concrete curb and gutter, concrete drive approaches, and new sidewalk; approximately 1,350 LF of 8-inch water main installation including valves, fire hydrants, water services and miscellaneous appurtenances; sump manifold pipe installation; approximately 230 LF of 8-inch sanitary sewer relay including service lateral reconnection, and miscellaneous appurtenances installation; tree removal; work zone traffic control; and erosion and sediment control measures, surface restoration, cleanup and miscellaneous appurtenant facilities required to complete construction. Gail Place (Adrian Boulevard - Rockwell Avenue) Gail Place includes, but shall not be limited to, approximately 1,600 SY of full depth asphaltic pavement pulverizing, shaping, grading, excavation below subgrade (EBS), 380 tons of asphaltic pavement, spot removal and replacement of concrete curb and gutter, concrete drive approaches, and new sidewalk; approximately 460 LF of 8-inch water main installation including valves, fire hydrants, water services and miscellaneous appurtenances; sump manifold pipe installation; one sanitary sewer point repair; tree removal; work zone traffic control; and erosion and sediment control measures, surface restoration, cleanup and miscellaneous appurtenant facilities required to complete construction Grove Street (Hilltop Trail - Rockwell Avenue) Grove Street includes, but shall not be limited to, approximately 7,700 SY of asphaltic pavement milling, excavation below subgrade (EBS), 1,800 tons of asphaltic pavement, spot removal and replacement of concrete curb and gutter, concrete drive approaches, and new sidewalk; approximately 1,530 LF of 8-inch water main installation including valves, fire hydrants, water services and miscellaneous appurtenances; sump manifold pipe installation; two sanitary sewer point repairs; tree removal; work zone traffic control; and erosion and sediment control measures, surface restoration, cleanup and miscellaneous appurtenant facilities required to complete construction. Maple Street (Hilltop Trail - Talcott Avenue) Maple Street includes, but shall not be limited to, approximately 2,300 SY of full depth asphaltic pavement pulverizing, shaping, grading, excavation below subgrade (EBS), 540 tons of asphaltic pavement, spot removal and replacement of concrete curb and gutter, concrete drive approaches, and new sidewalk; approximately 690 LF of 8-inch water main installation including valves, fire hydrants, water services and miscellaneous appurtenances; sump manifold pipe installation; one sanitary sewer point repair; tree removal; work zone traffic control; and erosion and sediment control measures, surface restoration, cleanup and miscellaneous appurtenant facilities required to complete construction. Grant Street (Talcott Avenue – Spry Street) Grant Street includes, but shall not be limited to, approximately 1,600 SY of full depth asphaltic pavement pulverizing, shaping, grading, excavation below subgrade (EBS), 370 tons of asphaltic pavement, spot removal and replacement of concrete curb and gutter, concrete drive approaches, and new sidewalk; approximately 460 LF of 8-inch water main installation including valves, fire hydrants, water services and miscellaneous appurtenances; sump manifold pipe installation; one sanitary sewer point repair; tree removal; work zone traffic control; and erosion and sediment control measures, surface restoration, cleanup and miscellaneous appurtenant facilities required to complete construction. Spry Street (Grove Street – Main Street) Spry Street includes, but shall not be limited to, approximately 4,200 SY of full depth asphaltic pavement pulverizing, shaping, grading, excavation below subgrade (EBS), 960 tons of asphaltic pavement, spot removal and replacement of concrete curb and gutter, concrete drive approaches, and new sidewalk; approximately 1,070 LF of 8-inch water main installation including valves, fire hydrants, water services and miscellaneous appurtenances; sump manifold pipe installation; one sanitary sewer point repair; tree removal; work zone traffic control; and erosion and sediment control measures, surface restoration, cleanup and miscellaneous appurtenant facilities required to complete construction.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents