Similar Projects
Desert Meadows Pre-K Building and Additional Parking
Addition, Alteration
Design
Laveen, AZ 85339

Cave Creek Road Improvements and Pedestrian Crosswalk Improvements Project
Infrastructure
Bidding
Carefree, AZ 85377

Bellemont Access and Safety Project
Post-Bid
Less than $3,700,000 est. value
Flagstaff, AZ

Zoo Parking Lot - Papago Park
Post-Bid
Phoenix, AZ 85008

The Shores North ADA/ABA- Construction of a Sidewalk
Results
Less than $25,000 est. value
Phoenix, AZ

Y--Painted Rock CG - ADA Concrete
Results
Phoenix, AZ 85027

Omega Alpha Academy - Remove and Replace Pavement at School Parking Lot
Infrastructure
Construction
Douglas, AZ 85607

Tuba City ADA Sidewalk Project
Post-Bid
Tuba City, AZ 86045

Hores North ADA/ABA- Construction of a Sidewalk Slab and Parking Slab
Results
Phoenix, AZ 85004

DCCD Driveway and Parking Lot
Post-Bid
Fort Defiance, AZ

Tierra Del Sol Staff Parking Lot Addition
Results
$100,000 to $125,000 est. value
Somerton, AZ 85350

Sidewalk and Parking Lot Improvements
Post-Bid
Holbrook, AZ 86025

Asphalt Patching and Miscellaneous Repair
Term Contract
Results
Less than $1,000,000 est. value
Gilbert, AZ 85296

Pinal County Call Center Site Improvements
Post-Bid
San Tan Valley, AZ 85242

BHS CHS HHS Parking Lots
Results
Less than $4,400,000 est. value
Chandler, AZ 85249

Last Updated 09/29/2021 12:06 PM
Project Title

2020 CDBG Sidewalk Improvement Project

Physical Address View project details and contacts
City, State (County) Casa Grande, AZ   (Pinal County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $50,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project generally consists of furnishing and installing twenty-eight (28) new sidewalk curb ramps in the vicinity of Cruz Park and West Park in the City of Casa Grande, where shown on the plans (construction drawings). The completed work shall provide accessible, barrier-free routes for the disabled community to access these two City Parks. Principal/major items of work include, but are not limited to, furnishing materials and constructing the following: 1. Concrete pavement removals (curb & gutter, valley gutter & aprons, sidewalks) 2. Asphalt pavement removals 3. Water valve adjustment 4. Sidewalk curb ramp construction (4 total, 2 types) 5. Sidewalk construction 6. Curb and gutter construction (roll & vertical) 7. Valley gutter construction (with apron areas) 8. Asphalt pavement construction 9. Site restoration and cleanup 10. Miscellaneous items of work to complete the project fully functional for its intended purpose.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents