Similar Projects
Northern Plains Nitrogen Fertilizer Plant
New Construction, Infrastructure
Conception
$200,600,000 CJ est. value
Grand Forks, ND 58202

Soybean Crush Plant Mixed Use Development / Grand Forks
New Construction, Infrastructure
Design
$400,000,000 CJ est. value
Grand Forks, ND 58201

Soybean Crush Plant Mixed Use Development / Grand Forks
New Construction, Infrastructure
Design
$400,000,000 CJ est. value
Grand Forks, ND 58201

Main Street - Mill and Pave
Infrastructure
Bidding
$400,000 CJ est. value
Grand Forks, ND 58201

Fog Seal 2023
Infrastructure
Bidding
$230,000 CJ est. value
Thompson, ND 58278

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Career Impact Academy / Grand Forks
New Construction, Infrastructure - 56,900 SF
Post-Bid
$28,000,000 CJ est. value
Grand Forks, ND 58201

2022 Sanitary Sewer, Watermain and Storm Sewer Repairs
Infrastructure
Results
$305,052 est. value
Grand Forks, ND

2022 Watermain Replacement
Infrastructure
Results
$1,184,396 est. value
Grand Forks, ND

Roundabout - City Of Grand Forks
Infrastructure
Pending Verification
$860,000 CJ est. value
Grand Forks, ND 58203

The Listen Center
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Grand Forks, ND 58201

On-Call Pipeline Repair and Replacement
Infrastructure
Post-Bid
Grand Forks, ND

Recycled HBP Overlay & Milling Surface County Road #6
Infrastructure
Results
$1,462,847 CJ est. value
Grand Forks, ND 58201

Red River High School Kraft Field Redevelopment
Infrastructure, Renovation
Pending Verification
$514,745 CJ est. value
Grand Forks, ND 58201

Disaster Resiliency Program (DRP) Formal Training Unit Building 631
Infrastructure, Renovation
Post-Bid
Gfafb, ND 58204

Last Updated 07/22/2023 12:02 AM
Project Title

Sanitary Sewer Phase 1 for Hwy 81 & Associated Area

Physical Address View project details and contacts
City, State (County) Grand Forks, ND 58203   (Grand Forks County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $2,870,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Est. Value: $ 2,870,000.00 Est. Completion Date: July 15, 2024 Furnish and Install 250 LF of Sanitary Manholes, 24 LF of Collection Manhole, 4,200 LF of Sanitary Sewer, 360 LF of Sanitary Service Lead, 8 Sanitary Service Wyes, 18,000 Ton of Class AA Backfill, 690 Ton of Aggregate Surfacing, 7 Acre of Seeding, and miscellaneous work. All work is to be in accordance with the Bidding Documents which are on file in the office of the City Engineer, Grand Forks, North Dakota, reference to which is made for detailed description of the work. Each bid must be accompanied by a separate PDF document (uploaded to Quest VirtuBid) containing an acceptable bidder's bond in a sum equal to five percent of the full amount of the bid, executed by the bidder as principal and by a surety, conditioned that if the principal's bid be accepted and the contract awarded to the principal, the principal, within ten days after notice of award, will execute a contract in accordance with the term of the bid and a contractor's bond as required by law and the regulations and determinations of the Grand Forks City Council. Each bid shall also contain a PDF document (uploaded to Quest VirtuBid) of the Contractor's License or certificate of renewal thereof issued by the Secretary of State which will be uploaded. Bidder must be licensed for the full amount of the bid. No bid will be read or considered which does not fully comply with the above provisions as to bond and license. The goal for MBE is 2% of the total dollar value of the project. The goal for WBE is 3% of the total dollar value of the project. To demonstrate a good faith effort to comply, bidders must include the MBE/WBE subcontractor solicitation form in the bid package. Bidders are required to comply with Davis-Bacon prevailing wage requirements. The City Council reserves the right to reject any or all bids and/or to waive any informality in the bids received and to accept any bid deemed to be most favorable to the interest of the City of Grand Forks. The successful bidder shall warrant and guarantee work for two years and shall furnish performance and payment bonds, in the amount of 100% of the contract. Bonds shall remain in effect until two years after date of final payment. Within fifteen (15) days after effective date of Agreement, Contractor shall submit to Owner a written notice indicating the specific date that Contractor will begin construction. Unless extended as per Article 11 of the General Conditions, Milestone 1A shall be completed by November 15, 2023, Milestone 1B shall be completed by June 1, 2024, Milestone 1C shall be completed by July 1, 2024, and all work shall be completed by July 15, 2024. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. All questions about the meaning or intent of the Bidding Documents are to be directed to the Engineer and shall be submitted to: Mr. Dale Bergum, PE Principal Engineer Webster, Foster, & Weston 1616 Mill Road Grand Forks, North Dakota 58203 ph: (701) 775-8118 7.02 Addenda may be issued to clarify, correct, supplement, or change the Bidding Documents

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents