Last Updated | 01/26/2023 09:33 AM |
Project Title | Fort Wayne Community Schools(FWCS) Masonry Projects |
Physical Address | View project details and contacts |
City, State (County) | Fort Wayne, IN 46802 (Allen County) |
Category(s) | Single Trades |
Sub-Category(s) | Masonry |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $599,342 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project M-1: 2023 Masonry Repairs at Lindley Elementary, Waynedale Elementary and South Side High School Stadium. Project M-2: 2023 Masonry Repairs at Shawnee Middle, Price Elementary and Northrop High School P/B Bid #BD101685 A refundable deposit of $100.00 made out to Fort Wayne Community Schools is required for each complete set of plans and specifications with a limit of one (1) set per contractor. Any unsuccessful bidder, upon returning such sets in good and usable condition within (10) ten days of the bid date will be refunded their deposit. There will be shipping and handling charges for the delivery of each set of Bidding Documents. Each bid proposal shall include all labor, material and services necessary to complete the projects in strict accordance with the drawings and specifications as prepared and on file in the office of: Martin-Riley Architects Engineers 221 West Baker Street FortWayne, Indiana 46802 260.422.7994 Each bid shall be accompanied by a certified check, a cashier's check or a bid bond executed by a surety company which is authorized to do business in the State of Indiana, made payable to the Fort Wayne Community Schools and in an amount equal to five percent (5%) of the bid. In the event a bidder withdraws its bid or fails to execute a satisfactory contract within ten (10) days after the contract is awarded to such bidder by Fort Wayne Community Schools, Fort Wayne Community Schools may declare the certified check, cashier's check or bid bond forfeited to Fort Wayne Community Schools, as liquidated damages. A bid may not be modified, withdrawn or cancelled by the bidder for sixty (60) days following the time and date designated for the receipt of bids without the consent of Fort Wayne Community Schools. Fort Wayne Community Schools reserves the right to reject any and all bids or waive any or all informalities, irregularities and/or inconsistencies in, or with respect to, any or all bids. Fort Wayne Community Schools reserves the right to assign all or any portion of any bid and/or contract to any non-profit building corporation controlled by Fort Wayne Community Schools without the consent of any other party, and any employee of Fort Wayne Community Schools may be designated by Fort Wayne Community Schools and/or any such non-profit building corporation to serve as the authorized agent or representative of such non-profit building corporation with respect to any such bid or contract. All contracts awarded in connection with these projects and all obligations of payment by Fort Wayne Community Schools or any non-profit building corporation controlled by Fort Wayne Community Schools shall be conditioned upon and subject to obtaining financing or other funds sufficient to pay all of the amounts set forth in such contract. All awarded contracts will be subject to termination, without penalty or liability, at the option of Fort Wayne Community Schools or any such non-profit building corporation at any time after execution of such contract in the event Fort Wayne Community Schools determines that funds will not be sufficient to pay all of the amounts set forth in such contract. Performance and Labor and Material Payment Bonds in an amount equal to one hundred percent (100%) of the contract amount shall be required to be provided by the successful bidder to Fort Wayne Community Schools or its assignee no later than ten (10) days after the execution of such contract. Such bonds shall remain in full force and effect for a period of twelve (12) months after the date of Substantial Completion. Bid results - |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |