Similar Projects
Taxiway A Rehabilitation - Phase I
Bidding
Plattsburgh, NY 12903

Parallel Taxiway Rehabilitation at Sullivan County International Airport
Post-Bid
Less than $2,500,000 est. value
Bethel, NY 12720

Parallel Taxiway Reconstruction, Widening, and MITL Reconstruction at Potsdam Municipal Airport
Post-Bid
Less than $1,900,000 est. value
Potsdam, NY 13676

Runway 10-28 Rehabilitation and Taxiway Connector
Results
Johnstown, NY

Watertown International Airport Runway 7-25 and Intersection Rehabilitation Project
Results
Watertown, NY 13601

Skaneateles Aerodrome Runway 10 Safety Improvements 2020
Construction
Skaneateles, NY 13152

Terminal Exit Lane Improvement Project
Post-Bid
Syracuse, NY 13212

Repair Aircraft Parking Apron & Shoulders
Results
$1,000,000 to $5,000,000 est. value
Newburgh, NY

Construction of Taxiways A and E Rehabilitation Phase II at Ithaca Tompkins Regional Airport
Post-Bid
Ithaca, NY 14850

Rehabilitate and Reconstruct Taxiway D
Results
Less than $3,000,000 est. value
Niagara Falls, NY 14304

Taxiway Rehabilitation at Le Roy Airport
Renovation
Post-Bid
$372,000 est. value
Le Roy, NY 14482

Wellsville Municipal Airport Runway 10-28 Rehabilitation
Results
$2,500,000 to $3,500,000 est. value
Wellsville, NY 14895

Exit Lane Monitors at Greater Rochester International Airport
Term Contract
Post-Bid
Rochester, NY 14624

Runway 5-23 Rehabilitation – Contract 1
Results
Saranac Lake, NY 12983

NFIA - Rehabilitate and Reconstruct Taxiway D
Post-Bid
Less than $4,000,000 est. value
Niagara Falls, NY 14304

Reported 04/30/2021 12:00 AM
Project Title

Taxiway A Rehabilitation - Phase III - TW - A, D and GA Apron

Physical Address View project details and contacts
City, State (County) Ithaca, NY 14850   (Tompkins County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed project generally includes approximately 1,100 lf x 50 Linear Feet (LF) of Taxiway “A” between the Terminal Apron, and mid-way between Taxiway “D” and Taxiway “E”, including approximately 220 LF x 90 LF of stub Taxiway “D”. Total taxiway pavement area to be rehabilitated is approximately 108,000 SF. Also included in the project is approximately 110,000 Square Feet (SF) of the General Aviation (“GA”) Apron pavement rehabilitation. No edge lighting or guidance sign improvements will be addressed as part of this project. Pavement rehabilitation construction is expected to generally include the following major items of work: 1. Milling of the existing surface course and cleaning and sealing of existing cracks with new bituminous material. 2. Application of a bituminous tack coat. 3. Construction of a true and leveling course to reestablish longitudinal and transverse grades. 4. Construction of a 2 to 3-inch bituminous surface course. 5. Application of new pavement markings. 6. Pavement rehabilitation is limited to the existing pavement footprint and the disturbance of turf will be limited to placement of topsoil and establishing turf within 50 feet of the pavement edge to raise or lower grades to match the overlay. 7. No improvements to the existing lighting and signage systems are proposed as part of this project. Turf adjustments adjacent to the pavement areas shall accommodate existing fixtures.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents