Similar Projects
MAH - Crescent Street Bridge Removal
Demolition
Post-Bid
Youngstown, OH

Renovate the Pedestrian Garage Bridge
Results
$2,500,000 est. value
Dayton, OH 45402

Elk Creek Metropark Sebald Park Bridge Improvements
Results
Less than $142,237 est. value
Hamilton, OH 45042

Lake Tomahawk Walkway Bridge
New Construction
Construction
$132,000 est. value
Negley, OH 44441

Bridge Replacement (1 Bridge) - Elizabeth Street Bridge
Results
OH

Bridge Replacement Project Known as MRW-CAN25-CR130
Results
Mount Gilead, OH 43338

Schiller Park Pedestrian Bridge Repair
Results
Columbus, OH 43206

FAI-TR251-0.406 Bader Road Bridge Replacement Project
Results
Less than $775,451 est. value
Lancaster, OH

TRU - Kinsman 30 Bridge (CH 360A Kinsman Pymatuning Road)
Results
Warren, OH

Gravel Washer Road Bridge Replacement PIK-CR82-1.64
Results
Less than $199,707 est. value
Waverly, OH 45690

Bridge Replacement (1 Bridge) - CR 1-09.04
Results
OH

Bridge Repair - US 422-12.26 Deck
Results
OH

Bridge Repair - BH-FY21
Results

Bridge Repair - SR 49-23.78
Results
OH

Red Hollow Road Bridge Replacement
Results
Less than $149,864 est. value
Waverly, OH

Reported 06/21/2022 03:07 PM
Project Title

Roadway Minor Rehab - SR 236

Physical Address View project details and contacts
City, State (County) Canal Fulton, OH 44614   (Stark County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Design Development
Bids Due View project details and contacts
Estimated Value $2,160,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a civil project in Canal Fulton, Ohio. Design plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway. Resurfacing of STA SR 236 from 5.50 to 7.72 and STA SR 241 from 11.44 to 17.90. Minor bridge rehab to three structures. As of June 17, 2022, the project is in Design status. Anticipated letting date is April 01, 2027. OHDOT - Roadway Minor Rehab - SR 236 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents