Similar Projects
Center Street Arch - City of Provo
Infrastructure
Conception
$1,000,000 est. value
Provo, UT 84601

48-inch Transmission Line/Canyon 36 - City of Provo
Infrastructure
Conception
$5,375,000 est. value
Provo, UT 84601

Harvey Well Deepening Project
Infrastructure
Design
$170,000 CJ est. value
Cedar Hills, UT 84062

Harvey Well Deepening Project
Infrastructure
Design
$170,000 CJ est. value
Cedar Hills, UT 84062

Antelope Island State Park, White Rock Bay Campground
Infrastructure
Bidding
$6,800,000 CJ est. value
Syracuse, UT 84075

Fire Station Expansion Project
Addition, Demolition, Renovation, Infrastructure
Bidding
$550,000 CJ est. value
Duchesne, UT 84021

State Bank of Southern Utah
New Construction, Infrastructure - 12,775 SF
Sub-Bidding
$1,000,000 CJ est. value
St George, UT 84790

RFQ D/B - West 388th/419th Fighter Wing Apron at Hill Air Force Base
Term Contract, Infrastructure
Post-Bid
$100,000,000 CJ est. value
Hill Air Force Base, UT 84056

Beaver Mountain Old BSA Gun Range Cleanup
Alteration
Post-Bid
UT

Power Building Site Work
Results
Salem, UT 84653

Udot Wetland Mitigation Site Maintenance
Term Contract
Results
Lindon, UT

Station Park North Site Development
New Construction, Alteration
Construction
Farmington, UT 84025

Antelope Animal Hospital Parking Expansion
New Construction, Alteration
Pending Verification
Syracuse, UT 84075

Red Bridge - Pid Super Pad
Alteration
Pending Verification
Orem, UT

Windsor Park - City Of Orem
Infrastructure
Conception
$569,000 CJ est. value
Orem, UT 84057

Last Updated 08/26/2022 11:31 PM
Project Title

Horizon Mine Well Abandonement Project

Physical Address View project details and contacts
City, State (County) Helper, UT 84526   (Carbon County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $900,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The State of Utah Division of Purchasing is the issuing procurement unit and State of Utah Division of Oil, Gas and Mining_ is the conducting procurement unit for this IFB (referred to as the State). The reference number for this IFB is Solicitation #JH22-19. This solicitation number must be referred to on all bids, correspondence, and documentation submitted to the State relating to this IFB. The purpose of this IFB is to enter into a contract with the lowest responsive and responsible bidder to provide: services according to Attachment B Scope of Work This contract will result in one purchase order award to the lowest cost responsive and responsible bidder. The contract resulting from this IFB will be for FIVE (5) years. Each bid received shall be evaluated for responsiveness in as outlined in the Utah Procurement Code. This IFB shall be evaluated by the objective criteria described in this IFB. Bids submitted must comply with the prerequisites and questions sections of this IFB. Any bid that does not comply with the prerequisite and questions sections will be deemed non-responsive and will be rejected. Question Submission Close Date 9/15/2022 2:00 PM MDT The work to be done shall consist of furnishing all labor, materials, and equipment for the complete and satisfactory permanent abandonment of one water monitoring well. The CONTRACTOR shall comply with all federal, state, and local laws and ordinances relating to performances of the work. All work is to be done in accordance with Utah Administrative Code Title R655-4-14. However, due to the location and unique condition of this well the plugging method may need to deviate from standard convention, and a variance obtained from Utah Division of Water Rights. The well is located approximately one-half mile from the paved Consumers Road southwest of Helper, Utah. Due to the rugged topography that surrounds the site the well may only be accessed on foot. Additionally, the bottom of the well was permanently damaged by coal mining activities during the time the Horizon Mine was active. Consequently, the bottom of the well bisects and empties into the underground mine workings.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents