Similar Projects
Saratoga Springs Lake Mountain Zone 2 South Pond and Losee Canyon Debris
Bidding
Saratoga Springs, UT

Sunbrook Golf Course Drainage
Bidding
Saint George, UT 84770

UDOT Culvert Cleaning and Video Contract
Term Contract
Post-Bid

UDOT Culvert Cleaning and Video Contract
Term Contract
Post-Bid

40th Street Detention Pond Project
Results
Less than $556,396 est. value
South Ogden, UT

Dry Creek Improvements
Results
Less than $1,000,000 est. value
Sandy, UT

Ashley Upper and Highline Canals Rehabilitation Project/CMAR
Construction
Less than $34,000 est. value
UT

Culvert Bid 2020
Post-Bid
Cedar City, UT 84721

Hiawatha Project Phase 2: Culvert Stabilization
Results
$140,000 to $150,000 est. value
Hiawatha, UT

Stormwater Runoff and Flood Mitigation Project
Post-Bid
Snowville, UT 84336

Zone 3 North 3 MG Reservoir Project
Results
Less than $3,200,000 est. value
West Jordan, UT 84088

Remove and Replace Approximately 110` of 14” Irrigation Culvert or Pipe
Post-Bid
Hinckley, UT 84635

Hooper Slough Box Culvert Project
Results
$150,000 to $200,000 est. value
West Haven, UT 84401

Replacement of the Existing Water Diversion Structure of the Bench Canal Heading
Post-Bid
Duchesne, UT

Manganese Road Culvert
Results
Less than $50,000 est. value
Saint George, UT 84770

Last Updated 07/31/2020 08:49 AM
Project Title

Vernal Drainage Project

Physical Address View project details and contacts
City, State (County) Vernal, UT 64078   (Uintah County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove and replace existing 24-inch corrugated metal pipe segments located on either side of the existing irrigation diversion box at SE corner of 600 West Main Street in Vernal. Both pipe segments are connected to existing 24-inch RCP. Install parallel 24-inch bypass pipe around the existing irrigation diversion box. Locate bypass pipe along the shoulder and tie into existing storm drain pipe. Intercept existing 18-inch CMP lateral. Plug old pipe lateral opening in existing catch basin at 620 West. Construct ped ramp and concrete sidewalk at the SE corner of 600 West. UDOT will provide cast-iron detectable warning panels. Contact John Jorgensen at the Vernal Shed, 435-828-7423. Remove existing steel plates that were placed underneath 6-inches of asphalt pavement at 720 West. Coordinate pickup with John Jorgensen, UDOT Vernal Shed.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents