Similar Projects
Route 1 Elementary School - Fairfax County Public Schools
New Construction, Infrastructure
Conception
$21,169,000 CJ est. value
Mount Vernon, VA 22309

Silver Line Elementary School - Fairfax County
New Construction, Infrastructure
Conception
$60,000,000 CJ est. value
Fairfax, VA 22030

Dunn Loring Elementary School - Fairfax County
New Construction, Infrastructure - 118,000 SF
Design
$35,332,424 CJ est. value
Vienna, VA 22182

Bren Mar Park Elementary School - Fairfax County
Renovation
Design
$55,000,000 CJ est. value
Alexandria, VA 22312

Security Vestibule Project - Phase 1, Package 2
Renovation
Bidding
$907,000 CJ est. value
Burke, VA 22015

Security Vestibules Project Phase 1 - Bid Package 1
Renovation
Bidding
$200,000 CJ est. value
Alexandria, VA 22306

Mosaic Elementary School Renovation Project
Renovation
Post-Bid
$37,907,334 CJ est. value
Fairfax, VA 22031

Louise Archer Elementary School Renovation Project
Renovation
Post-Bid
$500,000 CJ est. value
Vienna, VA 22180

Renovation Project Wakefield Forest Elementary School
Renovation
Results
$29,015,630 est. value
Fairfax, VA 22032

Automatic Temperature Control System Replacement
Renovation
Results
$821,000 CJ est. value
Reston, VA 20190

Louise Archer Elementary School - Fairfax County
Addition, Renovation, Infrastructure - 89,000 SF
Construction
$39,953,000 CJ est. value
Vienna, VA 22180

Wakefield Forest Elementary School Renovation Project
Renovation
Construction
$30,712,000 CJ est. value
Fairfax, VA 22032

Fiore Montessori Renovations
Renovation
Pending Verification
$800,000 CJ est. value
Vienna, VA 22182

Brymor Early Education & Preschool P-1 and P-3 Buildings / Lorton
Demolition, Renovation
Pending Verification
$800,000 CJ est. value
Lorton, VA 22079

Cub Run Elementary School - Fairfax County
New Construction, Infrastructure
Conception
$61,400,000 CJ est. value
Centreville, VA 20120

Last Updated 02/20/2024 01:06 PM
Project Title

Armstrong Elementary School Renovation - Fairfax County Public Schools

Physical Address View project details and contacts
City, State (County) Reston, VA 20194   (Fairfax County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids
Project Status Construction start expected March 2025 , Construction documents
Bids Due View project details and contacts
Estimated Value $43,600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project was identified according to the Renovation Queue, approved in 2009. Armstrong ES is ranked 49 of 63 schools in the queue. The project is in the planning/design phase, which was funded by the 2021 bond. The completed project will provide modern amenities and approximately 17,000 SF to the building. As of February 20, 2024, the project is in permitting with Fairfax County. An architect has been selected. Information regarding the timeline for bid/ construction has not been determined.

Details

97,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents