Similar Projects
Highgate AV-FY17-005
Infrastructure
Bidding
$6,150,000 CJ est. value
Highgate Center, VT 05459

Highgate AV-FY17-005
Infrastructure
Bidding
$6,150,000 CJ est. value
Highgate Center, VT 05459

Lake and Maple Apartments
New Construction, Infrastructure
Sub-Bidding
$10,000,000 CJ est. value
Saint Albans, VT 05478

Lake and Maple Apartments
New Construction, Infrastructure
Sub-Bidding
$10,000,000 CJ est. value
Saint Albans, VT 05478

Crafco Pavement Repair, Equipment, Supplies, Parts, and Repair Services
Infrastructure
Post-Bid
Montpelier, VT

Juaire Road Replacement Bridge
New Construction, Infrastructure
Post-Bid
Fairfield, VT 05455

Swanton-Highgate STP PS22(3)
New Construction, Infrastructure
Results
$2,500,000 to $5,000,000 est. value
VT

Statewide - Northeast Region Stpg Mark(317)
Infrastructure
Results
$1,000,000 to $2,500,000 est. value

Fairfield Street Emergency Department Expansion
Addition, Infrastructure, Renovation - 11,676 SF
Pending Verification
$11,000,000 CJ est. value
Saint Albans, VT 05478

Fairfield Street Emergency Department Expansion
Addition, Infrastructure, Renovation - 11,676 SF
Pending Verification
$11,000,000 CJ est. value
Saint Albans, VT 05478

Patton Shore Road Stormwater Improvements
Infrastructure
Bidding
$600,000 CJ est. value
Franklin, VT 05457

Boardwalk Construction
Addition, Infrastructure
Post-Bid
$100,000 est. value

Statewide - Northeast Region Stpg Mark(318)
Infrastructure
Results
$1,000,000 to $2,500,000 est. value

Nucar Automall of Saint Albans Expansion
New Construction, Infrastructure - 50,000 SF
Pending Verification
$13,200,000 CJ est. value
Saint Albans, VT 05478

Missisquoi Valley Rail Trail Concrete Slabs and Relocation of a Kiosk
Infrastructure
Post-Bid
$400,000 CJ est. value
Saint Albans, VT 05478

Last Updated 04/12/2023 11:07 AM
Project Title

Swanton Bridge 6 Joint Rehabilitation

Physical Address View project details and contacts
City, State (County) Swanton, VT 05488   (Franklin County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status All Bids Received, Results Expected, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Sealed BIDS shall be marked in the lower left hand corner: Bid Documents: Bridge 6 Over the Missisquoi River Rehabilitation BC2109. Each BID must be accompanied by a certified check payable to the Village of Swanton for five percent (5%) of the total amount of the BID. A BID bond may be used in lieu of a certified check. PREQUALIFICATION OF CONTRACTORS: All bidders on this project shall be on the Agency of Transportation's prequalified list under the category listed below or shall have submitted a complete prequalification application to the Agency of Transportation, Contract Administration, a minimum of 10 working days prior to the bid opening. For information contact Jon Winter at (802) 622-1267. This project is located in the Village of Swanton on Bridge No. 6 that carries VT Route 78 (Depot Street) over the Missisquoi River. During the advertisement phase of this project all questions shall be addressed solely to Reggie Beliveau Jr, 120 First Street, Swanton, VT 05488 (802-868- 3397)868 EQUAL EMPLOYMENT OPPORTUNITY (EEO) CERTIFICATION: Certification is required by the Equal Employment Opportunity regulations of the Secretary of labor (41 CFR 60-1.7(b) (1)) and must be submitted by bidders and proposed subcontractors only in connection with contracts and subcontracts which are subject to the equal opportunity clause. Generally only contracts and subcontracts of $10,000 or under are exempt as set forth in 41 CFR 60-1.5. See Appendix A for Contractors EEO Certification Form (CA-109). This certification form must be submitted with the bid. NON-COLLUSION AFFIDAVIT: All bidders are required to execute a sworn statement, certifying that the bidder has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with such contract. See Appendix B for Debarment and Non-Collusion Affidavit (CA-91). This affidavit must be submitted with the bid. DEBARMENT AFFIDAVIT: All bidders are required to execute a sworn statement, certifying that the bidder has not within the last three (3) years been, suspended, debarred, voluntarily excluded or determined ineligible by any Federal or State Agency; does not have a proposed suspension, debarment, voluntary exclusion or ineligibility determination pending; and has not been indicted, convicted or had civil judgment rendered against (it, him, her, them) by a court having jurisdiction in any matter involving fraud or official misconduct within the past three (3) years. See Appendix B for Debarment and Non-Collusion Affidavit (CA-91). This affidavit must be submitted with the bid. DAVIS BACON WAGE REQUIREMENTS: Bidders agree to abide by the Davis Bacon Wage Rate Schedule, which are appended to these Contract Documents.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents