Similar Projects
Harvest Meadows Phase Two - Water, Wastewater and Drainage Improvements
Post-Bid
Buda, TX 78610

Sunfield Phase 3 Section 6A Street, Drainage, Water, Wastewater, and Utility Improvements, The Sunfield Phase 3 Section 6B Street, Drainage, Water, Wastewater, and Utility Improvements; Sunfield Phase
Post-Bid
Buda, TX

Replace Influent Chiller-2019
Results
$95,000 to $108,000 est. value
San Marcos, TX 78666

Z--San Marcos Pond Yard Water Valves Replacement
Results
$100,000 to $250,000 est. value
San Marcos, TX 786661024

Construction Package #3 - Waterline Improvements & ARV Installation
Post-Bid
Less than $3,360,000 est. value
San Marcos, TX 78666

Trails at Windy Hill Phase 2
Results
TX

Sunfield Phase 3 Section 5C Street Improvements and Sunfield Phase 3 Section 5C Drainage, Water, Wastewater, and Utility Improvements
Post-Bid
TX

Blanco River Waterline Improvements
Results
San Marcos, TX 78666

Parten Ranch, Phase 5 Paving, Drainage, Water and Wastewater Improvements
Post-Bid
Dripping Springs, TX 78620

Main Lift Station Force Main Replacement
Results
$7,400,000 est. value
San Marcos, TX 78666

2020 CCSUD TWDB Projects Scada Consultant Services
Post-Bid
San Marcos, TX 78666

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Plum Creek Marketplace Avenue Phase 2 - Water, Wastewater, Drainage, and Paving Facilities
Post-Bid
TX

Hunter Road Pipeline Improvements and Nelson Transmission Line Project
Results
$690,000 est. value
San Marcos, TX 78666

Driftwood Club Core Phases 1 and 2 Paving, Drainage, Water, Wastewater, and Rainwater Collection System Improvements
Post-Bid
Driftwood, TX 78619

Last Updated 10/15/2020 11:14 AM
Project Title

Sportsplex Wastewater Line Upsize Project

Physical Address View project details and contacts
City, State (County) Buda, TX 78610   (Hays County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $253,902
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents