Similar Projects
MOTSU-22018 Annual Roof Repairs
Alteration
Bidding
$1,000,000 to $5,000,000 est. value
Southport, NC

Little River Roof Replacement Project
Alteration
Bidding
$150,000 est. value
Durham, NC 27712

Partial Roof Replacement Ligon Middle School Areas
Post-Bid
$500,000 to $600,000 est. value
Raleigh, NC 27601

Roofing (Metal)
Post-Bid
Robersonville, NC

Roof Replacement East Union Middle School Roofs 2.01 and 2.02
Results
Less than $100,000 est. value
Marshville, NC 28103

B129 Replace Roof and Apply Masonry Sealer
Results
$500,000 to $1,000,000 est. value
Cherry Point, NC 28533

Public Work Operation Center
Alteration
Construction
Durham, NC 27707

Re-Roofing at NC 95-1, Oak Forest Site
Alteration
Bidding
Forest City, NC 28043

Gutters and Downspouts
Post-Bid
Robersonville, NC 27871

Roof Replacement Central office Board of Education
Results
Jacksonville, NC 28540

Jail Re-Roofing Project
Alteration
Bidding
$600,000 est. value
Newton, NC 28658

Metal Carport
Post-Bid
Morganton, NC

AG Center Roof Replacement
Results
Edenton, NC 27932

Replacement of Rooftop MUA and AHU Units at Durham County Detention Center
Post-Bid
Durham, NC

Roofs Project at Morgan Britt Complex and Mccoll Page Plaza
Results
Lumberton, NC 28360

Last Updated 05/12/2022 08:36 AM
Project Title

Watermill Metal Roof Replacement Project

Physical Address View project details and contacts
City, State (County) Durham, NC 27704   (Durham County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove existing roofing materials and dispose of materials as required by law and regulations in a proper manner. Inspect the existing roofing deck system for signs of damage Dry-in with an underlayment for metal roofs such as Titanium UDL or an approved equal product Underlayment for ice and water shield Install a new 5-V metal roof system using 24ga. Steel panels secured to the deck using screws with sealing washers. Install flexible flashing “boots” at all plumbing vent pipes. Custom fabricate and install a stainless steel “header” flashing to complete with soldered corners and similar objects when multiple seams are disrupted. All required equipment, scaffolding, hoisting devices and all safety equipment Clean up roofing related debris will be daily with a thorough construction clean up after completion installation of a new metal roof.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents