Similar Projects
Resurface Various Streets 2022 Phase 1
Infrastructure
Bidding
Fayetteville, NC

On Call Asphalt Services 2021
Post-Bid
Fayetteville, NC

Resurface Various Streets, 2021 - Phase 2
Post-Bid
Fayetteville, NC

Resurface Various Streets, 2020 - Phase 2
Term Contract
Results
Eastover, Fayetteville, NC 28301

Joint Seal at Various Locations (Resurface 2021, Phase 1)
Results
Fayetteville, NC

Blue Ridge Parkway
Post-Bid
$85,000,000 est. value

Resurface Various Streets 2021 - Phase 1
Results
Fayetteville, NC 28302

DPW Horizontal MAIDIQ
Post-Bid
$1,000,000 to $5,000,000 est. value
Fort Bragg, NC 28310

MATOC Request for Proposal for Task Order Request Number W912HN-15- R0808, Bragg Airfield
Results
Fort Bragg, NC

Asphalt Re-Surfacing
Post-Bid
Fayetteville, NC 28304

B Street Sidewalk
Results
Fayetteville, NC 28301

Z2qa--565-21-301 Parking Lot Paving (Va-21-00042045)
Post-Bid
$25,000 to $100,000 est. value
Fayetteville, NC 28301

Asphalt Rejuvenation for Various Streets
Results
Fayetteville, NC

Bituminous Plant Mix Asphalt
Term Contract
Post-Bid

Slurry Seal for Various Streets
Results
Fayetteville, NC 28304

Reported 08/28/2021 12:00 AM
Project Title

Outdoor Basketball Court Resurface

Physical Address View project details and contacts
City, State (County) Pope Army Airfield, NC   (Cumberland County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value $25,000 to $100,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The 43 Air Mobility Operations Group (AMOG) has identified the necessity to repair the outdoor full-length basketball court on the south side of the Dormitory Campus next to building 298. The current basketball court has a rubber coating that has started cracking and bubbling making the court nearly unplayable and unsafe to use. The underlying court surface is not level and has large dips that hold water after rain showers. Requirements: - Remove all rubber coatings down to pavement surface - Level Out Pavement Surface (85x50ft) - Cover Pavement with plastic or rubber court surface (85x50ft) - Paint standard basketball court lines on court. - Install 2 new inground basketball hoops on each side of court; Height: 10 feet; Backboard: 60” Acrylic Optional Bleacher Requirement: - Install gravel and level 85x10ft area on North Side of the court next to building 298 for bleacher installation. - Install 3 sets of 4 tier bleachers along the North Side of the court next to building298.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 13 - Special Construction, Fabricated Engineered Structures, Grandstands and Bleachers, Bleachers.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents