Similar Projects
Reported | 08/28/2021 12:00 AM |
Project Title | Outdoor Basketball Court Resurface |
Physical Address | View project details and contacts |
City, State (County) | Pope Army Airfield, NC (Cumberland County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Request for Quotations |
Bids Due | View project details and contacts |
Estimated Value | $25,000 to $100,000 |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The 43 Air Mobility Operations Group (AMOG) has identified the necessity to repair the outdoor full-length basketball court on the south side of the Dormitory Campus next to building 298. The current basketball court has a rubber coating that has started cracking and bubbling making the court nearly unplayable and unsafe to use. The underlying court surface is not level and has large dips that hold water after rain showers. Requirements: - Remove all rubber coatings down to pavement surface - Level Out Pavement Surface (85x50ft) - Cover Pavement with plastic or rubber court surface (85x50ft) - Paint standard basketball court lines on court. - Install 2 new inground basketball hoops on each side of court; Height: 10 feet; Backboard: 60” Acrylic Optional Bleacher Requirement: - Install gravel and level 85x10ft area on North Side of the court next to building 298 for bleacher installation. - Install 3 sets of 4 tier bleachers along the North Side of the court next to building298. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |