Similar Projects
Avondale Water Tank Rehabilitations CMAR
Infrastructure
Bidding
Avondale, AZ

Water Tank Rehabilitation Project
Post-Bid
Snowflake, AZ 85937

New 300,000 Gallon Water Storage Tank at Well No. 4 Project
Post-Bid
Snowflake, AZ

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Livestock Storage Tanks
Post-Bid
Aguila, AZ

World-Wide Water Storage Tank Remediation
Term Contract
Results

Demolition of Existing Steel Water Storage Tank
Post-Bid
Canyon Day, AZ - Albuquerque, NM 85941

Underground Storage Tank Removal
Results
$25,000 to $100,000 est. value
Tucson, AZ 85707

Hospital Hill Tank Renovation
Post-Bid
Hayden, AZ

US EPA Tribal Nation Underground Storage Tank Program Support
Results

Water Storage Tanks
Term Contract
Post-Bid
Hereford, AZ 85615

Summit 2 Water Tank
Results
$3,000,000 to $4,000,000 est. value
Prescott Valley, AZ 86314

15ft Tanks for Willow Beach National Fish Hatchery
Term Contract
Post-Bid
Willow Beach, AZ 86445

Elevated Water Storage Reservoir, Piping and Appurtenances
Results
Winslow, AZ

Last Updated 10/01/2021 11:58 AM
Project Title

GRCA 230561 Desert View Water Tank Rehab

Physical Address View project details and contacts
City, State (County) AZ   (Coconino County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000 to $200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work includes utilizing divers to clean the tank interior and re-sealing all exterior wall panel edges of the 153,000 gallon water tank. Additional work includes relocating and modifying the existing ladder and accessories, , new handrail around the existing roof hatch and vent, replacing cathodic protection system sacrificial anodes, and improvements to the existing level indicator. The tank shall remain full during all construction activities.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents