Similar Projects
Crystal Lagoon
New Construction
Conception
FL

Bellweather Multifamily
New Construction
Conception
$138,800,000 est. value
Oxford, FL 34484

Oxford Cottages
New Construction, Infrastructure - 131,150 SF
Design
$36,000,000 CJ est. value
Oxford, FL 34484

Oxford Cottages
New Construction, Infrastructure - 131,150 SF
Design
$36,000,000 CJ est. value
Oxford, FL 34484

Resurfacing
Infrastructure
Bidding
$4,197,913 CJ est. value
Webster, FL 33597

Resurfacing
Infrastructure
Bidding
$4,197,913 CJ est. value
Webster, FL 33597

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Sprouts Farmers Market #650 / The Villages
Demolition, New Construction, Infrastructure - 23,256 SF
Post-Bid
$6,200,000 CJ est. value
The Villages, FL 32162

Park Improvements
Results
Coleman, FL

Strategic Resource Evaluation Study - Highway Construction Materials
Infrastructure
Results

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Parkview Apartments
New Construction - 320,791 SF
Construction
$10,000,000 CJ est. value
Wildwood, FL 34785

Sumter Villas
New Construction
Pending Verification
Bushnell, FL

Coleman Ridge Mixed Use Development
New Construction, Infrastructure - 7,100,000 SF
Pending Verification
$4,000,000,000 CJ est. value
Sumterville, FL 33585

South 19 Avenue Apartments
New Construction - 13,120 SF
Design
Hollywood, FL

Last Updated 10/12/2022 11:35 AM
Project Title

Eden Villages

Physical Address View project details and contacts
City, State (County) Wildwood, FL 34785   (Sumter County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Paving/Reconstruction, Site Development, Swimming Pool(s)
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $36,800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes the new construction of 799 and 1,268-square-foot apartments. As of September 6, 2022, construction has commenced. The general contractor is currently bidding all Vertical Trades by September 20, 2022. Completion is expected in approximately 24 months.

Details

1 Story Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Special Purpose Lighting, Underwater Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents