Similar Projects
Last Updated | 04/28/2023 10:39 AM |
Project Title | Rockville Armory Boiler Replacement Project |
Physical Address | View project details and contacts |
City, State (County) | Rockville, IN 47872 (Parke County) |
Category(s) | Government/Public |
Sub-Category(s) | Military Facility |
Contracting Method | Competitive Bids |
Project Status | All Bids Received, Results Expected, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $200,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Rockville Armory Boiler Replacement Contractors interested in bidding and/or reviewing this project may obtain complete Contract Documents, in either printed or electronic form, by registering as a plan holder and placing portal. The Architect/Engineer for this project is, Jack R. Kinkel and Son Architects, PC, 312 NW King Blvd, Suite 100, Evansville, IN portal, Contact information for RFI's and/or product substitution requests is JT Kinkel, JT@kinkel-ae.com or 812-425-6803. All RFI's and/or product substitution requests must be submitted in writing no later than February 7, 2023. Proposals shall be submitted on the proper bid form and delivered via email to include the name and address of the bidder, all as described in the Instruction to Bidders, which accompanies the specification. A Bid Bond made payable to the Adjutant General's Office, State of Indiana, must be enclosed with the bid. Said bond shall be in the minimum amount of five (5%) percent of the maximum bid including all additive alternate bids. All bidders must be Certified Contractors, hold a Valid Certificate of Qualification 1711.00, 1711.02, or 1712.01 from the Certificate Board, Room 467, Indiana Government Center, 402 West Washington Street, Indianapolis, Indiana, at the time of bid opening. Certification with the Department of Transportation does not meet the above mentioned requirement for pre-qualification. The bidder must be qualified in the classification of the prime contract. The contract for this work shall be awarded or rejected within sixty (60) calendar days from the date of opening bids. Funds are presently available for this acquisition. The State Armory Board reserves the right to reject any and all bids. Note: Contracts resulting from this solicitation will be required to conform to I.C. 4-13-18 (Contractor's Employee Drug Testing). Note: In accordance with I.C. 4-13-16.5-2, the following goals are established for this construction: MBE 7%, WBE 5% and IVBE 3%. Scope- The project consists generally of the removal and replacement of existing gas fired boilers, venting, piping, equipment, and specialties. Also included are all related boiler controls, electrical work, and all required system appurtenances. Project location: 224 West Strawberry Road, Rockville, Indiana 47872 |
||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |