Similar Projects
Last Updated | 06/24/2022 12:45 AM |
Project Title | Jere Baxter Middle School FY21 Equipment Replacement |
Physical Address | View project details and contacts |
City, State (County) | Nashville, TN 37207 (Davidson County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $200,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project is to include a building direct digital control (DDC) energy management system (EMS) to achieve precise control of all Heating, Ventilating, and Air Conditioning (HVAC) systems and provide the means to standardize control functions with energy saving strategies. Any new DDC components shall fully integrate with the existing building management system (BMS) workstation located at theMetropolitan Nashville Public Schools Facility & Grounds Maintenance Department, 1417 Murfreesboro Pike, Nashville, TN 37217. It is intended that all newly constructed buildings be controlled using standalone microprocessor, web-based, BACnet-compliant DDC computer systems. All hardware, software, and miscellaneous equipment required to ensure that the EMS can be managed from MNPS' local area network (LAN) shall be provided as a part of the project. The HVAC controls contractor(henceforth referred to as the "Contractor") shall be responsible for all low-voltage wiring installation and must coordinate networking with MNPS' Technology Information Services (TIS) department. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |