Similar Projects
2021 Laylin Park Pathway Improvements
Bidding
$109,370 est. value
Mason, MI

M-59 Sidewalk Project
Bidding
$351,000 est. value
Hartland, MI

Land Improvement Building Number 1009965 New Sidewalk and Pedestrian Lighting along Baxter Road Bidpack 01 - Construction
Post-Bid
Flint, MI

Green Infrastructure Retrofits for Center Line DDA Parking Lot
Post-Bid
Less than $350,000 est. value
Center Line, MI

Brewster Elementary Parking Lot 2019
Results
Less than $228,790 est. value
Rochester Hills, MI

211 Monroe Parking Lot Resurfacing
Results
Less than $24,134 est. value
Saline, MI

Kyte Monroe Parking Lot Reconstruction - 2021
Bidding
Saint Clair, MI

Municipal Parking Lot #5 Outfall Repair
Post-Bid
Birmingham, MI

Senior Center South Parking Lot Addition
Results
Sterling Heights, MI

Brys Park Parking Lot And Nature Path Rehabilitation - 2021
Bidding
Saint Clair, MI

Swan Valley - Shields Elementary Walking Path
Post-Bid
Saginaw, MI

Flint GM Fisher Guide Site (Chevy Commons Parcel A)
Results
Flint, MI

Lake Street Clair Hike / Bike Trail Reconstruction and North Marina Walk Repair
Bidding
Brighton, MI 48045

2020 Sidewalk Program
Post-Bid
Coldwater, MI

CDBG ADA Sidewalk and Ramp Installation
Results
$25,000 to $30,000 est. value
Milford, MI 48381

Last Updated 06/29/2020 10:53 AM
Project Title

Black River Small Watercraft Dock Enhancement

Physical Address View project details and contacts
City, State (County) South Haven, MI   (Allegan County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of an ADA accessible floating dock in the northwest quadrant of the Dyckman Bridge. This includes the placement of a pre-fabricated dock system, gangway to shore, timber piles, small concrete abutment, concrete sidewalk and restoration. The project includes the following approximate quantities of work: 1. 619 square feet of 6 inch concrete sidewalk, bulk head wall 24 feet in length, subbase, and site grading. 2. 3 each treated timber piles, 12 inch diameter, and 45 feet in length. 3. Install a floating dock system and gangway to shore.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents