Similar Projects
Influent Screw Pump Replacement, Phase 1
Alteration
Bidding
$3,300,000 est. value
Clinton, MA 01510

Temporary PFAS Treatment Well No. 7
Infrastructure
Bidding
$400,000 est. value
Dudley, MA

Cleaning, Redevelopment and Chemical Treatment of Gravel Packed Wells
Post-Bid
Less than $82,000 est. value
Walpole, MA

Well No. 3 Upgrades - General Bids
Post-Bid
Less than $750,000 est. value
Littleton, MA

Heather Row Grinder Pump (Furnish and Install)
Results
$225,000 est. value
Tewksbury, MA

GP 1 Replacement Well Implementation - General Bids
Results
$350,000 est. value
Seekonk, MA

Centrigugal Pump
Infrastructure
Bidding
Boston, MA

Backwash Pump VFD Project
Post-Bid
Walpole, MA 02081

B11 Well Pump Replacement
Results
$18,412 est. value
Springfield, MA

Replacement / Installation of a New Recycle Pump and Motor at the Water Treatment Plant
Infrastructure
Bidding
$60,000 est. value
Needham, MA

Dewatering Pump Restoration and Maintenance Service, Diesel Powered
Post-Bid
Charlestown, MA

Decommissioning of a Former Water Well
Results
$15,000 to $25,000 est. value
Huntington, MA

Double Suction Pumps and Appurtenances
Infrastructure
Bidding
Boston, MA

Well Cleaning 2 and 8 Redevelopment
Post-Bid
Sudbury, MA

Construction of Two Gravel-Packed Wells for Municipal Water Supply, and Decommissioning of Four Municipal Wells
Results
$475,000 est. value
South Dartmouth, MA 02748

Last Updated 09/14/2021 09:34 AM
Project Title

Butternut Ejector Station Conversion

Physical Address View project details and contacts
City, State (County) Rockland, MA 02370   (Plymouth County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $90,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents