Similar Projects
The Village at Oakland Park
New Construction
Conception
Oakland Park, FL 33311

Stellar Golden Glades
New Construction, Demolition
Conception
$1,000,000 to $5,000,000 CJ est. value
Miami, FL

Wreckers Cay Apartments at Stock Island
New Construction, Demolition - 306,304 SF
Design
Key West, FL 33040

Parks and Recreation Department New Tampa Community Park Inclusive Playground Design-Build
Design
Less than $1,600,000 est. value
Tampa, FL

West Pines Soccer Park Renovation of Fields 5 and 6
Renovation, Infrastructure
Bidding
Pembroke Pines, FL 33029

Design Build Services - Renovation of Spring Valley and William B. Armstrong Park
Renovation
Bidding
$3,400,000 est. value
Pembroke Pines, FL 33028

Alexan Crafts
New Construction, Build-Out - 465,650 SF
Sub-Bidding
$10,000,000 CJ est. value
Coral Gables, FL 33134

The Learning Experience
New Construction - 16,323 SF
Post-Bid
$1,425,000 est. value
Palm Beach Gardens, FL 33403

Tennis Court Repair (Recreation and Aquatic Center)
Post-Bid
New Port Richey, FL 34652

Julius Guinyard and Adjacent Park Improvement Project
Results
Less than $188,699 est. value
Jacksonville, FL 32202

Veterans Park at Beacon Hill
Results
FL

The Gatherings at Lake Nona
New Construction - 195,460 SF
Construction
Orlando, FL 32827

KWHS Backyard Design Build
Construction
Key West, FL 33040

Lake Sana Development
New Construction
Conception
Westview, FL 33147

Newfield - Master Plan
New Construction - 296,000 SF
Design
$10,000,000 CJ est. value
Palm City, FL 34990

Last Updated 08/02/2021 02:50 AM
Project Title

Hickory Point Improvements

Physical Address View project details and contacts
City, State (County) Tavares, FL 32778   (Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish and install a turn-key exfiltration trench system beneath the sand area of the existing volleyball courts, construct a seating wall and sidewalk, concrete ramp and concrete steps with railings, 6” thick concrete pad for future 8’ diameter structure, remove existing chain link fence and rip rap, remove existing electrical panel, remove existing drainage structure, install silt fence and temporary construction entrance.

Details

Park/Playground, New Construction.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents