Similar Projects
Sawtooth Campground & Cabins
New Construction, Infrastructure
Conception
Hill City, SD

Grading, Storm Sewer, Curb and Gutter, PCC Surfacing, Str Widening, Signals, Lighting
Infrastructure
Conception
$21,659,000 est. value
Sioux Falls, SD 57106

Porter's Eagle Ridge Estates
Design
Harrisburg, SD

Install Cured in Place Pipe Lining in Condenser Water Piping
Term Contract
Design
Pierre, SD 57501

Scour Protection
Infrastructure
Bidding
$734,000 CJ est. value
Belle Fourche, SD 57717

Primrose Retirement Community Civil Site Work
Infrastructure
Bidding
$500,000 est. value
Aberdeen, SD

Signing and Delineation
Infrastructure
Sub-Bidding
$958,000 CJ est. value
Tyndall, SD 57066

2021 Water Main Replacement Installation
Post-Bid
Wessington Springs, SD 57382

Streeter Drive Realignment
Post-Bid
$1,281,000 est. value
North Sioux City, SD

East Watertown Street Water Main Replacement
Results
Rapid City, SD 57701

Well Pipeline
Results
Less than $500,000 est. value
Wall, SD

Liberty Plaza Mixed Use
New Construction - 450,000 SF
Construction
$110,000,000 est. value
Box Elder, SD 57719

Modify Crossovers
Alteration
Conception
$4,481,000 est. value
Sioux Falls, SD 57109

Remove and Replace PCC Surfacing Replace Str, Grading
Infrastructure
Design
$34,171,000 est. value
Humboldt, SD 57035

Runway 12-30 Reconstruct, Extend and Widen
Infrastructure
Bidding
$500,000 CJ est. value
Wall, SD 57790

Last Updated 07/22/2022 09:04 AM
Project Title

Highway 25 Relocation Project

Physical Address View project details and contacts
City, State (County) De Smet, SD 57231   (Kingsbury County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $2,597,570 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project shall consist of the following work and approximate quantities and kinds of materials: Construction of approximately 8 miles of 1.5" to 16" pipeline, user services, valves, crossings, and miscellaneous appurtenant work. Est. Completion Date: Sept. 29, 2023

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents