Similar Projects
Last Updated | 01/31/2022 03:24 PM |
Project Title | 2022 Asphalt Overlay Project |
Physical Address | View project details and contacts |
City, State (County) | Federal Way, WA (King County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $4,552,678 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project shall consist of: Furnishing all materials, equipment, tools, labor, and other work or items incidental thereto (excepting any materials, equipment, utilities, or service, if any, specified herein to be furnished by the Owner or others), for the construction, sequencing, and traffic control plan for overlaying existing asphalt concrete pavement in eight (8) different locations within the City of Federal Way. The work shall include, but is not limited to: Hot Mix Asphalt (HMA Cl. ½” PG 58H-22) pavement overlay (approximately 13,750 tons), roadway excavation, planing bituminous pavement, pavement repair, removal and replacement of curb and gutter, sidewalk, curb ramps, traffic curb, repairing or re-aligning manholes and catch basins, traffic signal detection loops, pedestrian push button and foundation, channelization, restoration, utility adjustments, and all items necessary to complete the work. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |