Similar Projects
Moreau Emergency Squad Inc. - Building Expansion
Addition
Conception
Fort Edward, NY 12828

Polyset Expansion
Addition, Infrastructure - 24,500 SF
Conception
$1,250,000 CJ est. value
Mechanicville, NY 12118

One-Four-Six Marketplace
New Construction, Infrastructure - 151,000 SF
Design
$140,000,000 CJ est. value
Halfmoon, NY 12118

Summit At Halfmoon
New Construction, Infrastructure
Design
$26,000,000 CJ est. value
Halfmoon, NY 12065

The Riverview Apartments
New Construction, Infrastructure - 66,100 SF
Bidding
$6,000,000 CJ est. value
Corinth, NY 12822

Saratoga Springs Pump Station and Sewer Upgrades - General Construction
Renovation, Infrastructure
Bidding
$7,441,293 CJ est. value
Mechanicville, NY 12118

General Excavation Services
Infrastructure
Post-Bid
Ballston Spa, NY

Saratoga Springs Fire Station 3 - General Construction
New Construction
Post-Bid
$3,000,000 est. value
Saratoga Springs, NY 12866

New Firehouse #3 - Construction Management Services
New Construction
Results
Saratoga Springs, NY

New Station #3 Building for Vischer Ferry Fire District
New Construction, Demolition
Results
$3,900,000 est. value
Clifton Park, NY 12065

Tait Lane Reserve
New Construction, Infrastructure
Construction
$80,000,000 CJ est. value
Saratoga Springs, NY 12866

Corinth CSD - Capital Improvements - Contract No. 1 - General Construction
New Construction, Renovation, Infrastructure
Construction
$5,396,000 CJ est. value
Corinth, NY 12822

Chick-fil-A / Clifton Park
Demolition, New Construction, Infrastructure - 14,000 SF
Pending Verification
$1,000,000 CJ est. value
Clifton Park, NY 12065

Chloe's Place Development
New Construction, Infrastructure
Pending Verification
$35,000,000 CJ est. value
Saratoga Springs, NY 12866

Starting Gate Farm & Winery
New Construction, Infrastructure - 15,000 SF
Conception
$5,900,000 CJ est. value
Ballston Spa, NY 12020

Last Updated 01/09/2023 04:07 PM
Project Title

Jonesville Fire Training Building

Physical Address View project details and contacts
City, State (County) Clifton Park, NY 12065   (Saratoga County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Fire/Police Station, Site Development
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $83,800 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Jonesville Fire District is going out for bid to construct a training building located at 953 Main St, Clifton Park, NY 12065. Work to include concrete work along with general construction. CR Number: 2092155 Service-Disabled Veteran-Owned Set Aside: No Contract term: Construction of Training Building County(ies): All NYS counties Location: 953 Main St. Clifton Park, NY 12065 Business entities awarded an identical or substantially similar procurement contract within the past five years: None

Details

1,152 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents