Similar Projects
Upper Harbor Terminal Park Masterplan
New Construction, Infrastructure
Conception
$5,000,000 est. value
Minneapolis, MN

Rapid Disaster Infrastructure (RDI) #2
Design
Less than $99,000,000 est. value

Rapid Disaster Infrastructure (RDI) #2
Design
Less than $99,000,000 est. value

Furniture Fixtures and Equipment Seaway Building Remodel
Renovation
Post-Bid
Duluth, MN

Open Air Structures and Accessory or Utility Buildings with Related Equipment and Services
Post-Bid

ADA Improvements
Results
Minneapolis, MN 55408

Civil Construction Multiple Award Indefinite-Delivery Indefinite-Quantity (IDIQ) Contracts
Results
$250,000 to $5,000,000 est. value

New Hope Public Works Facility Phase 1 Improvements
Renovation
Construction
Minneapolis, MN 55428

Facilities Building
New Construction
Construction
$2,156,000 est. value
Duluth, MN 55811

MN Multiple Award Task Order Contract
Design
$2,000 to $10,000,000 est. value
Duluth, Saint Paul, MN

Facility Repair & Renewal (FRR) (MATOC) Phase 1
Post-Bid
Less than $450,000,000 est. value
Washington, DC

CDBG 2021 - Consolidated Pool
Results
MN

Facility Assesment and Planning with Related Services
Term Contract
Post-Bid

Washburn Crosby A Mill Complex Ruins Preservation 2021
Renovation
Results
MN 55401

Secure Construction SATOC
Post-Bid
$100,000,000 est. value
Washington, DC

Last Updated 01/06/2022 10:35 AM
Project Title

LLBO Construction Industry Workforce Training Facility

Physical Address View project details and contacts
City, State (County) Duluth, Grand Rapids, Minneapolis, MN (Hennepin, Itasca, Saint Louis Counties)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Leech Lake Reservation is in north-central Minnesota and covers parts of four counties: Beltrami, Cass, Itasca, and Hubbard, with the major portion located within Cass County. The reservation is situated 100 miles south of the Canadian border, 225 miles north of Minneapolis/St. Paul. 140 miles west of Duluth, and 155 miles east of Fargo, North Dakota. The Chippewa National Forest also partially overlaps the reservation border. The reservation has two regional economic hubs, the city of Bemidji, MN and the city of Grand Rapids, MN. Both are located outside the reservation borders. The reservation is bisected by State Highway 371 and U.S. Highway 2. The Tribal government is headquartered in the City of Cass Lake, MN. The Cass Lake area is the population center of the Reservation and is the location of the government facilities for the Leech Lake Tribal Council and other divisions and programs, as well as the offices for the Leech Lake Tribal College, Minnesota Chippewa Tribe, Cass Lake Indian Health Service Hospital and Clinic, and the Chippewa National Forest. There are more than 18 villages and scattered communities that lie within and outside the reservation boundaries. These include: District 1: Ball Club, Deer River, Inger, S Lake, Winnie Dam, Otenagen District 2: Bena, Boy River, Kego Lake, Smokey Point, Sugar Point District 3: Cass Lake, Cass River, Mission, Oak Point, Onigum, Sugar Bush/Buck Lake, Prescott

Details

Misc. Buildings, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents