Similar Projects
Fox College Parking Lot & Detention Addition
Conception
Tinley Park, IL

A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

Phase II Design and Phase III Construction Engineering
Infrastructure
Bidding
$2,188,000 est. value
Broadview, IL

A/E MEP IDIQ - Base Contract Jesse Brown VAMC
Post-Bid
$2,000 to $4,000,000 est. value
Chicago, IL 60612

Construction Inspection IDIQ (MATOC)
Post-Bid
Less than $100,000,000 est. value

US Route 30 (Jefferson Street) at Des Plaines River, Bascule Bridge Superstructure, Phase II
Results
Less than $12,000,000 est. value
Joliet, IL 60431

Phase II Project Management, Various Traffic Control and Signage Review
Term Contract
Results
Less than $400,000 est. value
Schaumburg, IL 60168

Architect, Engineer and Construction Manager at Risk
Post-Bid
IL

Parks Master Planning and Concept Design
Results
Orland Park, IL 60462

Traffic Engineering Services - RFP
Term Contract
Post-Bid
Highland Park, IL 60035

Northampton Lane Water Main Replacement
Results
Lincolnshire, IL

Engineering Services
Term Contract
Post-Bid
Riverside, IL 60546

Water Utility Continuity of Operation Plan
Results
Less than $150,000 est. value
Evanston, IL

ESCO Energy Performing RFP
Term Contract
Post-Bid
La Grange, IL 60525

Reported 02/25/2022 12:00 AM
Project Title

Various Phase II Traffic Engineering Services for Project Support and Engineering Management, Various Routes

Physical Address View project details and contacts
City, State (County) (Cook, DuPage, Kane, Lake, McHenry, Will Counties)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $6,250,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Phase Ii Engineering Services Are Required For Engineering Management, Project Support And Other Functions As Necessary To Accomplish Traffic Led Projects As Well As Operation & Maintenance Programs Within The Bureau Of Traffic. The Consultant Will Be Available To Provide Staff Responsible For Various Aspects Of Traffic Engineering Including Expressway And Arterial Highway Operations, Access Permitting, And Various Traffic Studies Associated With Implementation Of Traffic Control Devices. The Consultant May Also Be Required To Provide Project Managers To Manage Various Phase Ii Projects, Which Are Under Contract With Other Consultant Engineering Firms And Any Other Personnel To Assist In Various Work Tasks As Required. The Consultant Personnel May Be Expected To Perform Work Similar To An Idot Employee And Is Expected To Perform The Work At The District's Office, Satellite Offices, Such As Idot Traffic Systems Center Or Idot Emergency Traffic Patrol, Or Districtwide Field Locations. Consultant Is Expected To Provide Three (3) – Five (5) Traffic Engineers, Two (2) – Four (4) Engineering Technicians And One (1) – Two (2) Administrative Support Persons Up To Five (5) Days/Week Each, As Needed. Work Orders Under The Blanket Agreement Will Be Negotiated And Authorized By The Department On An As-Needed Basis.

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents