Similar Projects
North Meadows Mobile Home Park Expansion
New Construction, Infrastructure
Conception
$2,700,000 CJ est. value
Randleman, NC 27317

Memorial Square Apartments
Demolition, New Construction, Infrastructure
Design
$23,000,000 CJ est. value
Asheboro, NC 27203

Dollar Tree # 09116 / Asheboro - Rebid
New Construction, Infrastructure - 10,531 SF
Bidding
$400,000 CJ est. value
Asheboro, NC 27203

PDC Structural Repairs
Renovation, Infrastructure
Bidding
$120,000 CJ est. value
Asheboro, NC 27203

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

North Carolina Zoo Watani Habitat Improvement
Infrastructure
Post-Bid
$100,000 CJ est. value
Asheboro, NC 27205

Full Depth Reclamation
Infrastructure
Results
$1,464,368 CJ est. value
Liberty, NC 27298

Kraftsman Addition / Ramseur
Addition, Infrastructure - 9,600 SF
Pending Verification
$5,200,000 CJ est. value
Ramseur, NC 27316

Technimark Expansion
Addition, Infrastructure
Pending Verification
$8,000,000 CJ est. value
Asheboro, NC 27203

Milling, Resurfacing, and Shoulder Reconstruction
Infrastructure
Bidding
$5,000,000 CJ est. value
Asheboro, NC 27205

Thomas Estates
New Construction, Infrastructure
Pending Verification
$60,000,000 CJ est. value
Asheboro, NC 27203

Milling, Resurfacing, and Shoulder Reconstruction
Infrastructure
Bidding
$5,000,000 CJ est. value
Asheboro, NC 27205

I-74 Industrial Center
New Construction, Infrastructure - 1,000,000 SF
Pending Verification
$620,000,000 CJ est. value
Asheboro, NC 27205

Milling, Resurfacing, and Shoulder Reconstruction
Infrastructure
Bidding
$5,000,000 CJ est. value
Asheboro, NC 27205

Cone Health Cancer Center
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Asheboro, NC 27205

Last Updated 01/26/2023 04:03 PM
Project Title

Rocky Coast Stormwater Pump Station Improvements

Physical Address View project details and contacts
City, State (County) Asheboro, NC 27205   (Randolph County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $275,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Improvements to existing stormwater pump station including new 500 gpm submersible pumps, controls, associated appurtenances, replacement of approximately 60 LF of existing force main, and replacement of approximately 50 LF of existing gravity main. a. Project has been downloaded by Terrys Plumbing, SKC, and Dellinger. b. The proposal is a Lump Sum contract - signature pages were not included in the bid documents and will be provided with the Addendum No.1. These pages need to be completed when submitting your bid. c. MWBE Requirements apply to this project 10% goal provide appropriate affidavits with Bid and during the project. Guidelines are provided in project manual. Submit HUB Certification Participation form with Bid along with Attachment A or B. d. No Bid Bond is required to be submitted with the bid. Also, Performance and Payment Bonds will not be required. For Contract execution, submit Appendix C or D and other required documents. e. Time of Completion in the Project Manual is 60 days and Liquidated damages of $500 as described on first page of Supplementary General Conditions. We will work with the contractor for start of project time based on anticipated delivery of the pumps and controls. f. Work hours: Zoo verify - 8:00 - 5:00 weekdays. If needed other work times can be arranged if coordinated with Zoo staff. g. Parking should be off site at other Zoo parking area to limit number of vehicles on site to 1 or 2. Access for equipment and material delivery should be coordinated with Zoo staff. h. Replace stormwater line as noted on plans. i. Bypass pumping will be required while the pumps are out of service. This will be to handle constant water entering the stormwater system and when a storm occurs. The capacity shall be based on the proposed pump capacity of 500 gpm. Discharge can be in the last MH or directly into the pond as long as there is a settling area for the flow and the pipe is set so it can be driven over. j. Electrical improvements include setting a weather shield over the new Stormwater pump control panel and the existing sewer pump control panel.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents