Similar Projects
MOTSU Firefighting Water System
New Construction, Infrastructure
Design
$10,000,000 to $25,000,000 est. value
Southport, NC

Water Main Replacements - FY 22
Infrastructure
Bidding
$550,000 est. value
NC

Water Main Extension
Infrastructure
Bidding
$600,000 est. value
Godwin, NC

2020 Street, Drainage, Water and Sewer Improvements
Post-Bid
$630,000 to $730,000 est. value
Dunn, NC 28334

2021 Water Main Replacement Project
Post-Bid
Cary, NC

Design Build Services for a 24-Inch Water Main Extension
Results
Less than $7,267,250 est. value
Concord, NC 28026

Rockfish Creek Basin Peak Flow Facility Project
Results
$14,017,623 est. value
Fayetteville, NC 28302

Design-Build - Zone 2 Water Replacement (Package 1) Project
Alteration
Bidding
$15,000,000 est. value
Charlotte, NC

Phase 6 Water Improvements
Post-Bid
Enfield, NC 27823

2018 Water System Improvements
Results
Less than $1,013,675 est. value
Roper, NC 27970

Adjustable Valve Boxes With Lids
Infrastructure
Bidding
Asheville, NC

Stallings Road Water Improvements 2020
Post-Bid
Monroe, NC

16" Deep Raw Water Main Upgrade - Southern Outer Banks Water System
Results
Less than $450,000 est. value
Currituck, NC 27929

North Highway 61 Waterline Extension
Infrastructure
Bidding
$2,000,000 to $3,000,000 est. value
Gibsonville, NC 27249

Wastewater Flow Meter Calibration Services
Post-Bid
Gastonia, NC

Reported 06/15/2022 03:36 AM
Project Title

Water System Improvements

Physical Address View project details and contacts
City, State (County) NC   (Pasquotank County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Construction Documents, Construction Start Expected September 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes but not limited to the following Work: 15,445 LF 12-inch Water Mains, 2,035 LF 12-inch Directional Bored Water Mains, 80 LF 10-inch Water Mains, 66 LF 8-inch Water Mains, 5,340 LF 6-inch Water Mains, 41 EA 6-inch thru 12-inch Gate Valve, 19 EA Fire Hydrants, 16,322 LBS Compact Fittings, 7 EA Water Service Reconnects, 1 LS 715 GPM Water Booster Pump Station, 1 LS Commerce Park Tank Altitude Valve, 1 LS Meter Pit Removal.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents