Similar Projects
North River Valley Well Field and Pipeline Project
Infrastructure
Bidding
$5,596,980 CJ est. value
Ames, IA 50010

Polk Street Improvements
Infrastructure
Bidding
$429,960 CJ est. value
Bedford, IA 50833

Sioux City Elec Maint Bld Water Softener Replacement
Alteration
Post-Bid
Hinton, IA 51024

Cobblestone Hotel & Suites - City of Ottumwa
New Construction, Infrastructure
Post-Bid
$9,900,000 CJ est. value
Ottumwa, IA 52501

Polk County Election Office Fire Suppression, Plumbing, Mechanical and Electrical Repairs
Alteration
Results
Des Moines, IA 50309

Lake Wapello State Park Boy Scout Pond Outlet Replacement
Renovation, Infrastructure
Results
Drakesville, IA 52552

SE Trail Ridge Road Reconstruction
Infrastructure
Bidding
$1,830,000 CJ est. value
Grimes, IA 50111

Install Multiplex Water Softener
Alteration
Post-Bid
$250,000 to $500,000 est. value
Ames, IA 50010

Springreen Apartments Water Main Improvement Project
Infrastructure
Results
$113,984 CJ est. value
Asbury, IA 52002

2023 Street Repairs Project
Infrastructure
Bidding
$2,000,000 CJ est. value
Polk City, IA 50226

WWTP Vertical Loop Reactor Replacement Air Piping
Infrastructure
Post-Bid
$390,000 CJ est. value
Carroll, IA 51401

Wastewater Reclamation Facility Belt Filter Press Improvements
Renovation
Results
$1,991,800 CJ est. value
Des Moines, IA 50317

2023 Street Construction Project
Infrastructure
Bidding
$700,000 CJ est. value
Cedar Falls, IA 50613

2022 Stormwater Intake Repair Program
Infrastructure
Post-Bid
$295,867 CJ est. value
Des Moines, IA 50315

VA District - Phase 1 Improvements
Infrastructure
Results
$3,346,000 CJ est. value
Knoxville, IA 50138

Last Updated 03/01/2023 09:53 AM
Project Title

2023/24 Ames Plan 2040 Water Utility Infrastructure

Physical Address View project details and contacts
City, State (County) Ames, IA 50010   (Story County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $602,022 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This new program involves installation of public water infrastructure into priority tiers shown in the Growth Plan 2040. By installing the water systems proactively, this opens the development ability for lands in the adopted growth tiers. Design ahead of construction installation takes several months followed by a couple months for Iowa DNR permitting and two months for bidding and approval of contract and bond. 2023/24 Prairie View Industrial Center (East Lincoln Way: Teller Avenue to Potter Avenue ($1,000,000) extend 14" water main along US Highway 69 (Ken Maril south past waterway) ($525,000) Each successful bidder shall be required to furnish a corporate surety bond in an amount equal to one hundred percent (100%) of its contract price. Said bond is to be issued by a responsible surety approved by the City Council, shall guarantee the faithful performance of the contract and the terms and conditions therein contained, shall guarantee the prompt payment of all material and labor, protect and save harmless the City from claims and damages of any kind caused by the operations of the contract, and shall guarantee the maintenance of the improvement in good repair for a period of two (2) years from and after completion and acceptance by the City. The guaranteed maintenance period shall be four (4) years for new paving. This project is included in the city's 2022-2027 Capital Improvement Plan (CIP). As of July 13, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. As of December 22, 2022, no new information available

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents