Similar Projects
Last Updated | 12/23/2021 11:22 AM |
Project Title | Sewer Collection System Improvements |
Physical Address | View project details and contacts |
City, State (County) | Woodland, NC (Northampton County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sanitary Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project consists of replacing the existing 300 gpm pump/lift station with a new pump/lift station of the same capacity on the same site. The new pump/lift station will include a new precast concrete wet well with pre-fabricated enclosure with suction lift pumps, new electrical and control panels, new telemetry, and a new emergency generator. A manual bar screen in a precast concrete vault will also be constructed upstream of the wet well. The project will also include installing two (2) new manholes and associated gravity lines to redirect flow to the new wet well and replacing the existing two (2) automatic air release valves on the force main to the wastewater treatment plant. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |