Similar Projects
Lauderdale Drive, Bridge Over Green Lake, P-64-0921
Demolition, New Construction, Infrastructure
Bidding
$999,999 CJ est. value
Delavan, WI 53115

Lauderdale Drive, Bridge Over Green Lake, P-64-0921
Demolition, New Construction, Infrastructure
Bidding
$999,999 CJ est. value
Delavan, WI 53115

Sharon Hall Aluminum Handicap Ramp
Post-Bid
Sharon, WI

2021 Seal Coating
Post-Bid
Delavan, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

CTH-ES (Main Street) West Street to STH-20
Results
Walworth, WI

Pier Work
Infrastructure
Bidding
$100,000 CJ est. value
Lake Geneva, WI 53147

2021 Joint and Crack Filling
Infrastructure
Post-Bid
Lake Geneva, WI

East Troy Business Park South
Results
East Troy, WI

2022 Street and Utility Improvements
Infrastructure
Post-Bid
Delavan, WI

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

Crack Filling Various Town Roads
Infrastructure
Post-Bid
Delavan, WI

Judicial Center Parking Lot Rehabilitation
Results
WI

2022 Street Improvement Phase 1
Infrastructure
Post-Bid
$300,000 est. value
Lake Geneva, WI

2021 Road Improvements
Results
Lyons, WI

Last Updated 07/26/2022 05:34 PM
Project Title

2022 Street Program and Fontana Boulevard Irrigation System

Physical Address View project details and contacts
City, State (County) Fontana, WI 53125   (Walworth County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Concrete, Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

2022 Street Program and Fontana Boulevard Irrigation System Village of Fontana-on-Geneva Lake Walworth County, Wisconsin Project involves approximately 16,425 L.F. of 2-lane urban road mill & overlay on various streets in the Village of Fontana-on-Geneva Lake, rehabilitation, or reconstruction of three parking lots, and irrigation system reconstruction within Fontana Boulevard and Reid Park. The Project Manager for this Project is Emily Schmidt, who may be contacted at Ruekert & Mielke, Inc., W233 N2080 Ridgeview Parkway, Waukesha, WI 53188-1020, (262) 542-5733, regarding the Project. All Work is included in a single prime contract. Neither Owner, Engineer nor Issuing Office is responsible for full or partial sets of Bidding Documents, including any Addenda, obtained from other sources. The cost of Bidding Documents is non-refundable. Each entity obtaining Bidding Documents from the Issuing Office will be designated as a Plan Holder of Record. Bids received from entities who are not Plan Holders of Record may be returned as being nonresponsive. A Bidder's qualification statement must be delivered to the Village of Fontanaon-Geneva Lake at least 5 days before the Bid opening date. Bids shall be accompanied by a Bond or Certified Check payable to the Village of Fontana-on-Geneva Lake equal to 5 percent of the Bid. If the successful Bidder fails to execute the Contract and furnish payment and performance bonds within 15 days after the award, the Check or Bid Bond may be forfeited to the Village of Fontana-onGeneva Lake as liquidated damages. Construction time is of the essence. Completion delays are subject to liquidated damages. The Village of Fontana-on-Geneva Lake reserves the right to accept the most advantageous Bid, or to reject any and all Bids. Award of Work described herein is subject to the provisions of the Wisconsin Statutes. Village of Fontana-on-Geneva Lake Patrick Kenny, Village President Theresa Loomer, Village Administrator RUEKERT & MIELKE, INC. W233 N2080 Ridgeview Parkway Waukesha, Wisconsin 53188-1020 Phone: (262) 542-5733 Fax: (262) 542-5631

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents