Similar Projects
Last Updated | 12/01/2022 02:31 AM |
Project Title | New Monumental Sign for the Glenside Public Library |
Physical Address | View project details and contacts |
City, State (County) | Glendale Heights, IL 60139 (DuPage County) |
Category(s) | Single Trades |
Sub-Category(s) | Environmental |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $105,916 [brand] Estimate |
Plans Available from | Copy Center - 09/15/22 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Each bid must be accompanied by a Bid Guarantee in the form of a Bid Bond, Certified Check or Bank Draft in an amount equal to and not less than ten percent (10%) of the bid and made payable to Glenside Public Library District. No bid shall be withdrawn for a period of sixty (60) days after the bid opening date without the consent of the Owner. Checks or drafts of unsuccessful Bidders will be returned as soon as practical, after opening and checking the bids. Successful Bidder must provide a Performance Bond and a Labor and Material Payment Bond in the full amount of the Contract, acceptable to the Owner. Bids shall be submitted in an opaque sealed envelope clearly marked as SEALED BID and addressed to: Tom Bartenfelder Library Director Glenside Public Library District 25 E Fullerton Ave. Glendale Hei ghts, IL 60139 The Board of Trustees reserves the right to reject any or all bids or parts thereof or waive any irregularities or informalities in bidding. QUALIFICATION: Each Bidder must satisfactorily complete the qualification process described in Section 004395 -General Requirements of the Project Manual, by providing the required Qualification Documents. The required Qualification Documents must be delivered along with the Bidder's sealed bid at the same place and time required for the bid. Contents of each Bidder's Qualification Documents will be available for public review. All general contractors intending to submit a bid are required to visit the site. If the general contractor does not attend the pre-bid meeting for any reason, the general contractor can make a site visit at their convenience. Before OR after their visit to the new site, the contractor(s) must sign the sign in sheet that will be on file at the library. Not visiting the site and signing the sign in sheet will be grounds for rejection of bid. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |