Similar Projects
The Preserve Phase 4
New Construction, Infrastructure
Conception
$16,000,000 CJ est. value
Sherman, TX 75090

Mcgee Street Bridge - Erosion and Overlay Repairs - City of Sherman
Infrastructure
Conception
$900,000 CJ est. value
Sherman, TX 75092

Home Place Partners - Gallagher Warehouse
New Construction, Infrastructure - 7,500 SF
Design
$1,200,000 CJ est. value
Sherman, TX 75090

Freedom Jeep Showroom Addition / Sherman
Addition, Demolition, Infrastructure - 9,887 SF
Design
$2,970,000 CJ est. value
Sherman, TX 75092

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Whitewright Nature Park Pond Renovation
Infrastructure
Bidding
$321,000 CJ est. value
Whitewright, TX 75491

Mass Grading Operations for Churchill
Infrastructure
Post-Bid
Van Alstyne, TX

Mantua Point Phase 2A and 2B Grading Package
Infrastructure
Post-Bid
Van Alstyne, TX

Chloramine Conversion and Take Point Improvements Project
Infrastructure
Results
Howe, TX

Whitewright Waterline Improvements
Infrastructure
Results
$752,421 est. value
Whitewright, TX

Classic Chevrolet Cadillac of Denison
New Construction, Infrastructure - 75,200 SF
Construction
$18,500,000 CJ est. value
Denison, TX 75021

Hampton Inn & Suites Sherman
New Construction, Infrastructure - 49,260 SF
Pending Verification
$6,000,000 CJ est. value
Sherman, TX 75092

QuikTrip #1915
New Construction, Infrastructure - 5,312 SF
Pending Verification
$725,000 CJ est. value
Sherman, TX 75090

Lamberth Road Expansion - Shady Oaks To Friendship Road - City of Sherman
Infrastructure
Conception
$4,600,000 CJ est. value
Sherman, TX 75090

Hickory Hill Residential
New Construction, Infrastructure
Design
$95,000,000 CJ est. value
Sherman, TX 75092

Last Updated 12/08/2022 03:10 PM
Project Title

Design and Construct Storm Drainage System Under Blanton Drive - City of Sherman

Physical Address View project details and contacts
City, State (County) Sherman, TX 75092   (Grayson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Design & construct a storm drainage system under Blanton Drive from Birge Street to McGee Street. The project is included in the city's 2023-2027 capital improvement plan (CIP). As of December 8, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents