Similar Projects
Dabney Hall Upgrade Phase 3 - 8th Floor
Alteration
Bidding
Raleigh, NC 27607

Gas Water Heater and HVAC Venting Replacements
Alteration
Bidding
Raleigh, NC 27604

Cooling Tower Filtration Project
Post-Bid
Raleigh, NC 27616

Cooling Tower New Marley OEM Stainless-Steel Casing Panels Replacement
Post-Bid
Raleigh, NC 27616

Chiller Installation and Repair
Term Contract
Results
Raleigh, NC 27610

HVAC Installation and Repair
Term Contract
Results
Raleigh, NC 27610

Optimist Pool HVAC Replacement
Alteration
Bidding
Raleigh, NC 27609

Rooftop Air Handlers Replacement
Post-Bid
Raleigh, NC 27604

HVAC Water Treatment Installation and Repair
Term Contract
Results
Raleigh, NC 27610

Outdoor Walk-In Cooler/Freezer
Post-Bid
Raleigh, NC 27699

Security System Installation and Repair
Term Contract
Results
Raleigh, NC 27610

Cooling Tower Water Treatment at Raleigh`s Performing Arts Center
Post-Bid
Raleigh, NC 27602

Duct Cleaning IAQ
Term Contract
Results
Raleigh, NC 27610

Chemical Water Treatment Services for HVAC Systems
Term Contract
Post-Bid
Raleigh, NC 27623

HVAC Equipment Cleaning
Term Contract
Results
Raleigh, NC 27610

Last Updated 12/01/2021 03:52 PM
Project Title

HVAC System Replacement - Firearms Training Center

Physical Address View project details and contacts
City, State (County) Apex, NC 27539   (Wake County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Coordinate with Siemens Control System. Separate contract with owner. Coordinate with DARI, the lead abatement contractor. Separate contract with owner. Replace four (4) Roof-top Makeup Air Units. Replace four (4) Roof-top Filter Housing Frames with filters. Replace four (4) Utility Sets. Replace three (3) split system gas furnace with condensing unit. Replace three (3) in-line centrifugal exhaust fans. Replace two (2) gas fired unit heaters. Replace four (4) radiant infrared heaters. Provide new air distribution along firing line. Provide eight (8) VFDs. Provide new heavy-duty lay-in ceiling grid. Provide new LED lights along the firing line. Provide new disconnects, conduit and wiring for new equipment

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents